SCP-5726
Keter
~
medium confidence
SCP-5726
Expected annual
$5.2M
One-time setup
$12.4M
Annual recurring
$4.9M
Personnel
12
Initial one-time setup and contingency funding are the dominant costs (reinforced cryogenic chamber, equipment, and contingency reserves), with ongoing annual expenses driven by dedicated staff, MTF readiness, cryogen supply and maintenance. Total one-time setup (including reserve funds) is dominated by structural and contingency funding; recurring annual operations are dominated by personnel and readiness costs.
One-Time Capital Costs
Total: $12.4M
Annual Recurring Costs
Total: $4.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.9M/yr
Normal year with no major incidents; routine operations, maintenance, staffing, and scheduled training only.
no breach
regular maintenance
scheduled training
🚨
Minor Incident
$5.4M/yr
Localized containment event requiring cleanup, limited repairs, medical care, and limited legal/amnestic actions.
small breach or localized detonation
one-off cleanup and liner replacement
medical treatment for injured staff
🚨
Major Breach
$9.9M/yr
Significant containment breach with structural damage, multiple injuries, large cleanup and noticeable public exposure requiring major cover-up actions.
multi-room detonations
substantial structural repair
large-scale amnestic/legal operations
🚨
Catastrophic Breach
$29.9M/yr
Full catastrophic containment failure with extensive civilian exposure, major rebuilding, large casualty compensation and complete reserve drawdown.
facility-level breach
significant civilian casualties or publicity
full reserve deployment and rebuild
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Senior Researcher | 2 | [#9] Senior researchers assigned as primary points of contact and study leads (2). |
| Research Technician | 2 | [#9] Technical staff to support experiments, monitoring, and maintenance (2). |
| Security Officer / MTF Agent | 6 | [#9] Full-time on-site security officers dedicated to containment (6). |
| Engineer / Containment Systems Engineer | 1 | [#9] Systems engineer to maintain cryo, HVAC, and containment infrastructure (1). |
| Medical Officer / Site Medic | 1 | [#9] On-site medic for trauma care, decontamination, and amnestic administration support (1). |
Confidence Notes
Estimates derive from analyst-provided ranges for each line item; many items (especially contingency reserves and breach remediation costs) have large ranges and scenario-dependent variability, so totals are approximate. Confidence is medium because primary line items are well-identified but per-event costs and reserve sizing are highly uncertain.