SCP-5744
Euclid
~
medium confidence
SCP-5744
Expected annual
$29.5M
One-time setup
$54.6M
Annual recurring
$26.1M
Personnel
46
Initial capital costs are substantial (~$54.6M) driven by island base, mothership purchase, vessels and deep‑sea hardware; annual operating costs are dominated by personnel, depreciation/reserve and logistics (~$26.1M/yr). Major cost drivers are the choice to purchase vs charter a mothership and the need for frequent human entries for Procedure‑L91.
One-Time Capital Costs
Total: $54.6M
Annual Recurring Costs
Total: $26.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$26.1M/yr
Normal operational year with purchased mothership and in‑house ROV capability; Procedure‑L91 conducted using on‑site assets and D‑Class rotations.
routine Procedure-L91 schedule
no major incidents
🚨
Charter Mothership
$46.9M/yr
Operations rely on chartering specialized motherships for fortnightly human entries (Procedure‑L91), greatly increasing annual operational charter costs.
Procedure-L91 requires human entry
inability to maintain in‑house mothership/submersible
🚨
Major Breach
$38.1M/yr
Containment breach or public exposure requiring large emergency response, replacement of equipment, legal payouts and extensive cover operations.
unauthorised exposure/escape
procedural failure during Procedure-L91
Personnel
46 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | armed guards and boarding teams for exclusion zone enforcement and ship interceptions. |
| Boat Crew / Maritime Operators | 8 | crew for patrol vessels and support small boats/RIBs. |
| Research Scientist | 6 | marine biologists, neurologists, memetic experts performing ongoing study and Procedure-L91 oversight. |
| ROV/Submersible Operators | 4 | certified pilots/operators and maintenance specialists for remote vehicles. |
| Engineer / Maintenance | 5 | site engineers, vessel/submersible maintenance, generator/facilities upkeep. |
| Medical Officer | 2 | on‑site emergency medicine, decompression chamber operators, ENT capability oversight. |
| Administrative Staff | 4 | logistics, procurement, permitting, and admin support. |
| Cooks/Housekeeping | 4 | base support staff for berthing and daily operations. |
| Site Director / Executive Staff | 1 | overall on‑site command and liaison with HQ and local authorities. |
Confidence Notes
Estimates use midpoints of wide ranges given in analyst notes; major cost drivers (purchase vs charter, ROV vs manned submersible, frequency of human entries) introduce substantial variance. Many line items are correlated, so uncertainty remains moderate.