SCP-5757 Euclid ~ medium confidence
SCP-5757
Expected annual
$22.2M
One-time setup
$237.5M
Annual recurring
$19.8M
Personnel
89
One-time establishment costs are dominated by potential land purchase and infrastructure buildout (~$237M total in the chosen estimate); recurring annual operations run at roughly $19.8M/year driven by 24/7 armed security, persistent surveillance & research, and cover/legal operations.
🏗️ One-Time Capital Costs Total: $237.5M
Facilities $160.8M
[#1, #2, #3, #10, #19] Land purchase for the C-139 Annex footprint (chosen midpoint purchase option), perimeter exclusion works, hardened checkpoints/guard houses, Faraday-shielded secure vault buildout, and field camp construction.
Insurance Contingency Reserve $30.0M
[#26] Insurance / contingency reserve for catastrophic escalation (illustrative reserve chosen within provided range).
Decommissioning Remediation $20.0M
[#30] Contingent decommissioning and land remediation / settlement costs (mid-range estimate).
Equipment $11.4M
[#6, #7, #8, #11, #16, #22, #24, #25] Field vehicles (airboats, swamp buggies), owned aviation (helicopter purchase), persistent sensor network, initial storage hardware, medical equipment, initial SIEM/logging hardware, spare parts inventory/manufacturing setup, and communications infrastructure.
Legal Contingency Reserve $5.0M
[#17] Contingency allowance for litigation or major legal cases (midpoint of recommended contingency range).
Security Initial Equipment $3.5M
[#4] Initial weapons, body armor, radios, training & equipment for armed security teams.
Initial Research And Lab Setup $3.0M
[#9, #12, #15, #23] Atari Jaguar hardwiring/retro-hardware engineering & custom capture interface, initial algorithm/ML development costs, mobile field research lab buildout, and initial red-team/safety research program setup.
Incident Response Fund $2.0M
[#28] Standing incident response fund / rapid-procurement reserve established up-front.
Remediation Contingency $1.5M
[#21] Contingency for environmental remediation/major disposal if incidents occur.
Training Programs $300K
[#20] Initial staff training programs (ROE, lethal-force training, ethical/psych training) and kickoff training costs.
🔄 Annual Recurring Costs Total: $19.8M/yr
Staff Wages $8.5M/yr
[#4, #5, #13, #12, #9, #16, #19] Salaries for 24/7 armed security force, wildlife enforcement/cover personnel, video analysts/watch officers, ongoing data-science/maintenance staff, hardware maintenance engineer, medical officers, and administrative support.
Research And Monitoring $3.0M/yr
[#8, #11, #12, #14, #15, #22, #23, #29] Surveillance maintenance & data links, cloud replication/backups, algorithm & model maintenance + compute, geospatial/LIDAR/drone mapping cadence and GIS staff, specialist contracts for analysis, logging/forensic operations, ongoing red-team experiments, and passive population-management monitoring.
Logistics And Transport $2.8M/yr
[#6, #7, #25, #19, #28] Vehicle fuel/maintenance, owned aviation operating costs (or charter-equivalent), communications leases and link fees, recurring lodging/food/transport for field staff, and replenishment of rapid-response funding where applicable.
Land Lease Management $1.9M/yr
[#1] Alternative recurring cost if site is managed via long-term lease/management rather than purchase (midpoint lease/management cost).
Cover Story And Legal $1.5M/yr
[#5, #17, #18, #27] Legal retainers, PR operations and staged restoration spending, contractor/permit fees to coordinate local agencies, and ethics/oversight board/audit costs.
Facilities Maintenance $800K/yr
[#2, #3, #10] Annual maintenance and operations for perimeter exclusion infrastructure, checkpoint operations & maintenance, and secure vault utilities/security costs.
Supplies And Consumables $640K/yr
[#11, #15, #16, #21, #24] Ongoing storage/media replacement, laboratory consumables and outsourced tests, medical & mortuary consumables, containment waste disposal contracts, and annual spare-parts refresh.
Incident Response Replenishment $500K/yr
[#28] Annual replenishment allowance for the incident response fund as used.
Psych Support $150K/yr
[#20] Ongoing counseling, monitoring, and debrief budgets for staff exposed to distressing content and lethal-authorization duties.
Cost Scenarios
📊 Baseline (baseline) $19.8M/yr
85.0% probability / year
Normal operational year with no major incidents; recurring operations continue under existing posture.
routine_operations no_major_incidents
🚨 Minor Incident $21.3M/yr
10.0% probability / year +$1.5M vs baseline
Localized containment failure, small legal claim or equipment loss requiring elevated response and remediation.
localized_breach small_legal_claim equipment_failure
🚨 Major Breach $39.8M/yr
4.0% probability / year +$20.0M vs baseline
Significant containment breach or escalation requiring large-scale remediation, litigation, emergency procurement and possible partial decommissioning actions.
widespread_breach major_litigation large_scale_remediation
🚨 Land Purchase $169.8M/yr
1.0% probability / year +$150.0M vs baseline
Foundation elects to purchase the full Annex land footprint outright instead of leasing, incurring the large one-time land acquisition expense in that year.
strategic_acquisition policy_decision
👥 Personnel 89 total
Role Count Notes
Security Officer / MTF Agent 45 [#4] 24/7 armed field containment teams (chosen midpoint between 30–60).
Wildlife Enforcement / Cover Agent 20 [#5] Cover-story/concealment personnel posing as conservation/restoration crews (10–30 range).
Video Analyst / Watch Officer 14 [#13] 24/7 video/watch staffing (10–18 personnel range).
Research Scientist / Data Scientist 4 [#12, #23] Ongoing algorithm maintenance, ML operations, and red-team researchers (3–6 core devs/analysts; chosen conservative ongoing staff).
Engineer / Maintenance 1 [#9, #24] Retro-hardware engineer and maintenance specialist for Jaguar hardware and capture systems.
Medical Officer 2 [#16] On-site med/casualty response staffing and liaison for mortuary/forensics.
Administrative Staff 3 [#17, #19] Site admin, logistics, and cover-story coordination support.
📋 Confidence Notes
Analyst notes supply detailed line-item ranges for nearly all cost drivers (land, security, surveillance, research), allowing midpoint estimates, but several major choices (purchase vs lease, owned aviation vs charter, contingency sizing) require judgment calls, so overall confidence is medium.
← SCP-5756 ↑ All SCPs SCP-5758 →