SCP-5801
Safe
~
medium confidence
SCP-5801
Expected annual
$1.8M
One-time setup
$2.2M
Annual recurring
$1.8M
Personnel
13
One-time startup/capital costs are approximately $2.22M driven by site acquisition, field station construction, vehicles, generators, instruments and contingency seed funds; recurring annual costs are approximately $1.76M driven primarily by staff wages, remote-site fuel/utility costs, research/monitoring, travel/logistics, and legal/cover obligations.
One-Time Capital Costs
Total: $2.2M
Annual Recurring Costs
Total: $1.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.8M/yr
Normal year of routine monitoring, upkeep, staff rotations and occasional small tasks with no major incidents.
No incidents; routine operation
🚨
Minor Incident
$1.9M/yr
Small-scale incidents such as tourist intrusion, limited medical emergency, or several amnestic administrations requiring extra relocations and medevac.
tourist intrusion
small medical emergency
multiple amnestic administrations
🚨
Major Breach
$3.0M/yr
Significant containment event or public exposure requiring large-scale remediation, legal settlements, emergency airlift/evacuation and extended research response.
structural change to barrier
major public exposure
mass casualty or widespread media leak
Personnel
13 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 7 | [#12] On-site guards to enforce red-zone perimeter and cover 24/7 shifts; estimate uses 6–8 guards (7 used here). |
| Medical Officer | 1 | [#13] One medic/EMT on rotation for medical emergencies and post-incident care. |
| Amnestic Technician | 1 | [#13] One trained amnestic technician per rotation for civilian amnesticization. |
| Research Scientist | 2 | [#20, #22] Field researchers performing interviews, sensor data analysis and external collaborations. |
| Site Director / Executive Staff | 1 | [#20] Field director/site scientist responsible for operations and reporting. |
| Administrative Staff | 1 | [#20] Administrative support for logistics, scheduling, procurement and liaison. |
Confidence Notes
Medium confidence: analyst notes provide explicit ranges for almost every line item and a clear operational picture (remote Arctic site, surveillance, staffing), but many recurring costs depend on variable factors (tourist frequency, fuel prices, number of amnesticizations) and asymmetric tail-risk scenarios make precise prediction uncertain.