SCP-5803
Unknown
~
medium confidence
SCP-5803
Expected annual
$1.8M
One-time setup
$2.3M
Annual recurring
$1.8M
Personnel
20
First-year one-time setup is approximately $2.35M with recurring annual operations around $1.80M; main cost drivers are personnel (security + research/admin), one-time sealed-cell and facility upgrades, and optional advanced research which can push one-time costs into seven figures.
One-Time Capital Costs
Total: $2.3M
Annual Recurring Costs
Total: $1.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.8M/yr
Normal year with scheduled monitoring, no major incidents or containment breaches.
routine_operations
annual_May_28_observation
🚨
Minor Incident
$1.9M/yr
Localized equipment failure, minor contamination or small unauthorized recording leak requiring response and limited repairs.
equipment_failure
unauthorized_recording_leak
localized_sensor_loss
🚨
Major Breach
$2.7M/yr
Coordinated raid or forced containment failure requiring emergency relocation, large repairs, and extended legal/PR response.
coordinated_raid
forced_relocation
containment_failure
Personnel
20 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#8] 4 guards per shift covering 24/7 -> ~12 FTEs as specified; salary+30% overhead included in staff_wages. |
| Containment Specialist | 2 | [#9] 1–2 containment specialists (counted as 2 FTE within the 6 FTE containment/research staff). |
| Research Scientist | 2 | [#9] 2 researchers (anomalous-objects) included in the 6 FTE research/containment staff. |
| Audio Engineer / Analyst | 1 | [#9] 1 audio engineer/analyst included in research staffing. |
| Conservator / Conservation Specialist | 1 | [#9, #20] 1 conservator for physical artifacts included in research staffing; ongoing conservation maintenance is budgeted separately. |
| Administrative Staff | 2 | [#28] Program manager(s), procurement and accounting staff included in administrative payroll allocation. |
Confidence Notes
Most recurring costs and personnel requirements are well-described (medium confidence). Large ranges on hardware, optional advanced research, and contingency scenarios introduce uncertainty; advanced research and major relocation costs are especially variable.