SCP-5814
Unknown
~
medium confidence
SCP-5814
Expected annual
$10.8M
One-time setup
$22.4M
Annual recurring
$10.5M
Personnel
17
Estimated initial capital and startup costs are approximately $22.4M driven primarily by facility build-out, precision optical and analytical instrumentation, a multi-station measurement network, and an optional mitigation R&D seed. Annual recurring operations are estimated at ~$10.54M/yr driven by staffing, MTF sustainment, Greenland site operations/expeditions, data/infrastructure operations, and mitigation research.
One-Time Capital Costs
Total: $22.4M
Annual Recurring Costs
Total: $10.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$10.5M/yr
Normal year with steady monitoring, routine expeditions and no major incidents.
routine_measurements
scheduled_maintenance
periodic_field_ops
🚨
Emergency Response Deployment
$12.5M/yr
Triggered multi-station urgent campaign and global rapid-response after >10 consecutive deviations requiring extra equipment and expeditions.
>10_consecutive_deviations
rapid_additional_stations
urgent_expeditions
🚨
Major Expedition
$11.5M/yr
Large Greenland/archaeological expedition and sustained field campaign requiring heavy airlift and extended MTF support.
large_field_campaign
extensive_exhumation_or_recovery
🚨
Mitigation Scaleup
$20.5M/yr
Leadership mandates large-scale mitigation/ark program expansion requiring sustained multimillion-dollar annual outlays.
strategic_mitigation_decision
off-world_or_large-scale_ark_program
Personnel
17 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 4 | [#7] Senior physicists/chemists responsible for experiment design and oversight. |
| Postdoc / Senior Technician | 4 | [#7] Postdocs and senior technicians handling daily experiments and sample prep. |
| Metrology Engineer | 2 | [#7] Engineers maintaining precision measurement systems and traceability. |
| Data Scientist / Computational Researcher | 3 | [#7, #14] Data analysis, simulation and computational chemistry staff. |
| Lab Technician / Night Ops | 4 | [#8] Rotating technical staff to provide 24/7 coverage, calibration and on-call engineering. |
Confidence Notes
Analyst notes provide detailed line items and ranges allowing a mid-confidence estimate, but outcomes depend on leadership choices (optional mitigation scale-up), episodic expedition frequency, and long multi-decade preservation costs, leaving material uncertainty.