SCP-5817
Unknown
~
medium confidence
SCP-5817
Expected annual
$9.5M
One-time setup
$26.6M
Annual recurring
$8.4M
Personnel
30
Initial setup (facility, technical installs, legal setups, and contingency reserves) is dominated by facility construction and hardened control equipment; recurring costs are driven by staff wages, legal/PR operations, compensation funds and continuous monitoring, totaling several million USD per year.
One-Time Capital Costs
Total: $26.6M
Annual Recurring Costs
Total: $8.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$8.4M/yr
Normal operational year with expected monitoring, monthly events handled within standard procedures and no major public incidents.
monthly_SCP_occurrences_handled
no_uncontrolled_public_exposure
🚨
Minor Incident
$8.9M/yr
Localized escalation requiring extra takedowns, per-incident compensation, increased PR and limited in-country deployments.
unexpected_mirrors_found
localized_public_attention
🚨
Major Breach
$28.4M/yr
High-profile containment failure or public disclosure requiring massive legal settlements, large-scale PR/compensation and operational overhaul.
catastrophic_public_disclosure
international_diplomatic_crisis
Personnel
30 total
| Role | Count | Notes |
|---|---|---|
| Incident Response / Network Analysts | 12 | [#6] 24/7 monitoring and incident commanders; majority of operational headcount. |
| Cyber Operations / Takedown Agents | 5 | [#7] Core offensive/registrar takedown and obfuscation team. |
| Legal & Policy Staff | 3 | [#8] In-house counsel and international law specialists for rapid filings and liaison. |
| Public Relations / Disinformation Ops | 2 | [#9] PR managers and campaign coordinators for cover stories and crisis messaging. |
| Monitoring Analysts / Moderators | 3 | [#23] Human reviewers triaging automated flags and platform escalations. |
| Research Scientists | 2 | [#18] Study SCP-5817 mechanics and develop countermeasures and analysis tools. |
| Engineers / Maintenance | 2 | [#12, #22] Maintain secure comms, servers, and perform hardware lifecycle replacements. |
| Administrative Staff / Site Coordinator | 1 | [] Site-level administrative and coordination duties. |
Confidence Notes
Estimates derive from broad ranges in analyst notes and per-country variability; staffing and political/legal costs are reasonably well defined but many line items (diplomatic payments, catastrophic contingency) have high uncertainty, so confidence is medium.