SCP-5866
Unknown
~
medium confidence
SCP-5866
Expected annual
$3.3M
One-time setup
$7.6M
Annual recurring
$3.2M
Personnel
19
First-year capital outlay is dominated by bespoke containment construction, a suspended transparent containment vessel, and specialist equipment; recurring yearly costs are driven by security and dedicated research staff. Estimated one-time setup is roughly $7.63M with ongoing annual operations around $3.15M.
One-Time Capital Costs
Total: $7.6M
Annual Recurring Costs
Total: $3.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.2M/yr
Normal operational year with routine maintenance, staffing, research, and no containment incidents.
routine_operations
scheduled_research
no_incidents
🚨
Minor Incident
$3.4M/yr
Localized equipment failure or small unauthorized exposure requiring repairs, targeted PR/legal response, staff overtime, and limited medical/psych support.
equipment_failure
localized_memetic_exposure
unauthorized_access
🚨
Major Breach
$8.2M/yr
Significant containment failure or public exposure leading to mass proselytizing, large-scale legal/relocation costs, emergency community buyouts, and major contingency drawdown.
full_containment_breach
mass_public_exposure
political_or_religious_backlash
Personnel
19 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#11] Active-duty armed guards on a three-shift rotation; salaries included in staff_wages. |
| Security Supervisor | 2 | [#11] Supervisory/security management staff; salaries included in staff_wages. |
| Research Scientist | 1 | [#12] Principal Investigator (Dr.-level) dedicated to SCP-5866; salary and clearance costs included in staff_wages. |
| Research Technician | 3 | [#12] Research assistants/technicians supporting experiments and monitoring; salaries included in staff_wages. |
| Security Liaison / Access Control Officer | 1 | [#12] Dedicated liaison coordinating access control between research and security; salary included in staff_wages. |
Confidence Notes
Analyst notes provide detailed line items and ranges, allowing a plausible budget build; however, wide ranges for capital items, unknown anomalous behavior and contingency sizing introduce material uncertainty.