SCP-5912 Euclid ~ medium confidence
SCP-5912
Expected annual
$85K
One-time setup
$304K
Annual recurring
$82K
Personnel
0.2
Initial one-time containment and research setup is estimated at $303,500, driven largely by containment retrofit, instrumentation, and a high-cost contingency upgrade reserve; recurring annual operations are estimated at $82,050, driven mainly by ongoing research, facilities maintenance, and contingency reserves.
🏗️ One-Time Capital Costs Total: $304K
Escalation Containment Upgrade Reserve $200K
[#24] Containment upgrade contingency reserve for escalation to Keter-level containment (airlocks, negative-pressure chamber, robotics).
Facilities $35K
[#1] Containment chamber retrofit (floor drain, waterproofing, insulated walls, vapor barrier).
Initial Research And Lab Setup $30K
[#11] Baseline biological/chemical analysis and imaging (isotope, MS, micro-CT, histology).
Environmental Sensors Installation $8K
[#4] Thermal cameras, humidity sensors, micro-precip sensors hardware and integration.
Microclimate Unit Installation $6K
[#3] Dedicated dehumidifier and localized HVAC unit installation.
Heated Plumbing And Sump $6K
[#2] Heated drain / freeze-prevention plumbing (heat trace + insulated piping + sump pump).
Training And Sop Dev $5K
[#20] Initial SOP development and training for handlers.
Cctv Macro Imaging $4K
[#5] Macro/micro cameras and specialized lighting for 3 cm subject observation.
Transport Secure Transfer $2K
[#18] Temperature-managed secure transfer to Site-17.
Locking And Access Control Upgrades $2K
[#21] Chamber locking upgrades, keyed access and remote lockdown capability.
Micro Wastewater Treatment System $2K
[#15] Small filter/treatment system to handle sugar-laden meltwater.
Furnishings Enrichment Initial $1K
[#6] Initial stock of doll-sized furniture and enrichment items.
Tooling Inventory Setup $1K
[#19] Database and containment lockers setup for produced items inventory.
Ppe And Microtools Initial $1K
[#9] Initial procurement of cryogenic-rated gloves, microforceps, magnifiers.
Equipment $0
[]
🔄 Annual Recurring Costs Total: $82K/yr
Research And Monitoring $36K/yr
[#4, #12, #23] Ongoing research & experiments (behavioral, climatology, shrinkage study), sensor telemetry/data storage and periodic long-term risk assessments.
Contingency Emergency Fund $15K/yr
[#17] Annual reserve for HVAC failure, containment breach remediation, flooding and emergency repairs.
Staff Wages $12K/yr
[#7, #8, #16] Technician weekly rearrangement/handling (~0.05 FTE), routine inspections/security allocation (~0.1 FTE), administrative/documentation fraction (~0.05 FTE).
Facilities Maintenance $7K/yr
[#2, #3, #5, #13, #15, #21] Heated plumbing/equipment maintenance and electricity trace, microclimate electricity, CCTV maintenance, containment materials testing & replacement, micro-wastewater maintenance, access control maintenance.
Cover Story And Legal $6K/yr
[#22] Legal/cover-story and public relations budget for potential external detections.
Supplies And Consumables $4K/yr
[#6, #9, #10, #14, #25] Furnishings/enrichment replacement, PPE replacements/consumables, micro-food consumables, de-icing/cleanup supplies, miscellaneous consumables.
Microfood Separate Billing $1K/yr
[#10] Optional separate billing for lab tech time preparing miniature offerings (if not absorbed into staff wages).
Training Refresher $1K/yr
[#20] Annual refresher training and SOP updates.
Logistics And Transport $200/yr
[#19] Tooling inventory tracking and annual maintenance of tracking systems/lockers.
Cost Scenarios
📊 Baseline (baseline) $82K/yr
89.0% probability / year
Normal year with routine operations, monitoring, and scheduled maintenance only.
routine_operations scheduled_maintenance
🚨 Minor Incident $92K/yr
10.0% probability / year +$10K vs baseline
Localized HVAC or plumbing failure, small flooding/icing event requiring remediation and minor repairs.
localized_hvac_failure minor_icing_spill
🚨 Major Breach $232K/yr
1.0% probability / year +$150K vs baseline
Containment failure or expansion of anomalous storms beyond chamber requiring significant remediation and partial containment upgrade.
containment_breach storm_expansion widespread_icing
👥 Personnel 0.2 total
Role Count Notes
Technician 0.05 [#7] Weekly rearrangement, handling and preparation tasks (~0.05 FTE).
Security Officer / MTF Agent 0.1 [#8] Routine inspections and containment rounds (~0.1 FTE).
Administrative Staff 0.05 [#16] Data logging, incident reports, administrative coordination (~0.05 FTE).
📋 Confidence Notes
Notes provide detailed line items and ranges for most costs, but estimates rely on mid-range selections and site-specific variables (existing chamber condition, local labor/electricity rates, and research scope). High-cost contingencies are low-probability and imprecise, so overall confidence is medium.
← SCP-5911 ↑ All SCPs SCP-5913 →