SCP-5926
Euclid
~
medium confidence
SCP-5926
Expected annual
$1.2M
One-time setup
$240K
Annual recurring
$1.1M
Personnel
10
One-time capital and containment setup (~$240k) is modest compared with recurring staffing, testing, waste disposal and overhead which drive an expected annual cost in the low seven figures (~$1.14M/year). Primary recurring drivers are dedicated security and research staffing, medical surveillance, testing, biohazard disposal and administrative overhead.
One-Time Capital Costs
Total: $240K
Annual Recurring Costs
Total: $1.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.1M/yr
Normal year with no major incidents; regular staffing, testing, disposals, training and overhead.
routine_operations
scheduled_testing
regular_maintenance
🚨
Minor Incident
$1.2M/yr
Localized contamination, minor costume damage or small medical exposure requiring overtime, cleanup, disposal and limited replacement parts.
minor_damage_to_costume
localized_contamination_cleanup
staff_overtime/medical_visit
🚨
Major Breach
$1.9M/yr
Significant containment failure or medical emergency requiring large-scale decontamination, potential BSL upgrade or extensive medical/legal response and replacement of infrastructure/costume.
major_containment_breach
facility_decontamination
BSL_upgrade_or_large_replacement
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#3] Six FTE guards to provide 24/7 coverage (includes benefits and hazard pay). |
| Research Scientist | 2 | [#4] Two full-time research staff/technicians assigned to SCP-5926 operations and testing. |
| Psychologist / Clinician | 1 | [#5] Part-time psychologist/clinician for screenings and enrichment (0.5–1.0 FTE coverage budgeted). |
| Containment Technician | 1 | [#6] Technician to perform bi-weekly disassembly/maintenance and follow BSL procedures (0.5–1.0 FTE coverage budgeted). |
Confidence Notes
Many line-items are well-specified (staffing, disposables, testing), yielding moderate confidence; large uncertainty remains around whether a BSL-3 upgrade is required (major one-time capital) and frequency/severity of containment incidents, so totals can vary significantly if site lacks existing lab/cell infrastructure.