SCP-5969
Safe
~
medium confidence
SCP-5969
Expected annual
$305K
One-time setup
$408K
Annual recurring
$304K
Personnel
3
Initial one-time containment and equipment costs are approximately $408,500, driven by blast-resistant vault construction, HVAC/dehumidification and backup power, and EOD protective equipment; recurring annual operations are about $304,300/yr, driven mainly by staff wages (EOD/security), HVAC/backup power maintenance, and site overhead.
One-Time Capital Costs
Total: $408K
Annual Recurring Costs
Total: $304K/yr
Cost Scenarios
📊
Baseline
(baseline)
$304K/yr
Normal year with routine operations, maintenance, and no detonation or public exposure.
no incidents
regular maintenance
scheduled training
🚨
Minor Incident
$319K/yr
Single internal detonation limited to containment cell requiring investigation, cleanup and minor repairs.
isolated detonation
internal cleanup and forensic analysis
🚨
Major Incident
$379K/yr
Detonation with staff injury, significant equipment damage and extended investigation; possible replacement of containment infrastructure.
detonation with injuries
extensive forensic analysis
containment repairs/replacement
🚨
Public Exposure
$454K/yr
Detonation or proliferation that becomes visible to civilians, requiring major legal/PR response, cover stories, and possible regulatory payments.
public sighting
media exposure
regulatory/legal action
Personnel
3 total
| Role | Count | Notes |
|---|---|---|
| EOD Technician | 1 | [#9, #8] Full‑time EOD for direct handling, suited entries and incident response; also uses Level‑3 suits. |
| Security Officer / MTF Agent | 2 | [#10] Pro‑rata site security allocation covering access control and guarding for the cell. |
Confidence Notes
Cost ranges are based on detailed line items but several items (EOD staffing model, conditional legal/cover‑up costs, and per‑incident scales) are uncertain; mid‑range estimates used.