SCP-6026
Unknown
~
medium confidence
SCP-6026
Expected annual
$9.0M
One-time setup
$37.3M
Annual recurring
$8.8M
Personnel
34
One-time capital (mid-range) dominated by purchasing and retrofitting a dedicated research vessel (~$29.8M), plus equipment (~$5.8M) and lab setup (~$1.54M). Annual operating costs are driven by on-site personnel, fuel/transport and maintenance (~$8.79M/yr baseline).
One-Time Capital Costs
Total: $37.3M
Annual Recurring Costs
Total: $8.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$8.8M/yr
Owned and retrofitted dedicated vessel; normal year with no major incidents. Recurring operations as budgeted.
normal_operations
routine_surveillance
no_major_incidents
🚨
Minor Incident
$9.1M/yr
Limited containment incident requiring emergency medevac, localized repairs, short-term overtime and PR mitigation.
limited_breach
medical_evacuations
emergency_repairs
🚨
Protocol 17 Activation
$12.8M/yr
Full Protocol-17 forced capture/removal requiring rapid mobilization, charters, heavy-lift and diplomatic mitigation.
refusal_to_comply
large_scale_capture
international_mitigation
🚨
Charter Option
$11.3M/yr
Operational year where Foundation elects to run containment via long-term chartered vessel rather than owned platform (higher recurring OPEX).
management_choice
charter_instead_of_purchase
Personnel
34 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 18 | [#4] Multi-shift MTF team providing continuous surveillance, including operatives and immediate-response personnel. |
| Ship Crew / Civilian Mariners | 10 | [#3] Captain, engineers, deckhands and support crew to operate the vessel 24/7 (separate from MTF). |
| Research Scientist / Lab Tech / ROV Pilot | 6 | [#5, #15, #14] Onboard scientific and technical staff: marine biologists, ROV pilots and lab technicians for monitoring and experiments. |
Confidence Notes
Detailed analyst notes provide many line-item ranges, but large ranges on vessel choices, protocol costs and legal/cover operations introduce uncertainty. Estimates use mid-range assumptions and a baseline ownership model; alternative (charter) and incident costs remain uncertain, warranting medium confidence.