SCP-6028
Unknown
?
low confidence
SCP-6028
Expected annual
$7.6M
One-time setup
$13.6M
Annual recurring
$7.5M
Personnel
7
One-time upfront costs (notably a potential full-scale site acquisition) total large sums (~$13.6M), while recurring annual operations to run the archival/acquisition/OSINT/PR program and rapid-response capabilities are the dominant ongoing cost (~$7.5M/year). Major drivers: historical acquisitions, long-term archival/digital infrastructure, legal/PR & media suppression, and contingency for a possible containment attempt.
One-Time Capital Costs
Total: $13.6M
Annual Recurring Costs
Total: $7.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$7.5M/yr
Normal operational year: archival acquisitions, OSINT monitoring, research grants, PR/legal retainers, and routine field activities but no major incidents or containment attempts.
routine acquisitions
ongoing OSINT detections
standard research and PR activities
🚨
Minor Incident
$8.0M/yr
Localized event requiring emergency acquisition, rapid-response expedition, legal action, and targeted media suppression (no public catastrophic exposure).
high-profile auction or leak
small-scale public disclosure requiring takedown
🚨
Containment Attempt
$37.5M/yr
Identification of a stable, accessible anomalous instance and decision to attempt physical containment, triggering large one-time capital outlays and greatly increased operations.
discovery of a stable physical site
policy decision to attempt physical containment
Personnel
7 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Historian / Archivist | 4 | [#4] Core historians, archivists, paleographers and cataloguers (FTEs responsible for acquisitions, authentication, and cataloguing). |
| Research Technician / Lab Technician | 1 | [#13] Field-lab and sample-processing technician support for mobile lab operations. |
| Legal / Acquisition Specialist | 1 | [#5] In-house legal/acquisition liaison to coordinate purchases, licensing, and takedown efforts. |
| Administrative Staff | 1 | [#4] Program coordinator / administrative support to manage operations, travel, and contracts. |
Confidence Notes
Estimates are built from wide ranges in analyst notes and multiple speculative contingencies (especially physical containment). Many line items depend on unpredictable discoveries, litigation outcomes, and political variables; therefore uncertainty is high.