SCP-6033
Unknown
~
medium confidence
SCP-6033
Expected annual
$484K
One-time setup
$224K
Annual recurring
$476K
Personnel
6
Initial setup is moderate (~$225k one-time) driven by research instrumentation and contingency reserves; annual operations are roughly $476k/yr dominated by research staffing, incident readiness, nightly security/transport, and administrative overhead.
One-Time Capital Costs
Total: $224K
Annual Recurring Costs
Total: $476K/yr
Cost Scenarios
📊
Baseline
(baseline)
$476K/yr
Normal year with nightly operations, scheduled monitoring, and no major incidents.
routine nightly sessions
scheduled research and monitoring
regular admin/overhead
🚨
Minor Incident
$506K/yr
Small containment incident or medical emergency (e.g., acute migraine requiring ER, brief unauthorized exposure, minor property damage) requiring limited emergency response.
medical emergency for subject or agent
brief unauthorized viewing
limited property or equipment damage
🚨
Major Breach
$726K/yr
Significant containment breach or anomalous escalation requiring deployment of larger MTF, temporary containment infrastructure, family relocation, and major PR/legal responses.
uncontrolled SCP-6033-1 manifestations outside protocol
telekinetic/teleportation damage or safety event
public exposure requiring large-scale amnesticization
Personnel
6 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 1 | [#3] One posted Foundation agent nightly in Toby's bedroom. |
| Driver / Escort | 1 | [#4, #5] Dedicated driver/escort for nightly transfers between Site-58 and residence. |
| Research Scientist (PI) | 1 | [#12] PI time (0.5–1 FTE reflected in research staffing budget). |
| Research Technician / Postdoc | 1 | [#12] 1 FTE postdoc/technician for instrumentation and data collection. |
| Data Analyst | 1 | [#12] Data analyst time for logging and analysis (covered in research budget). |
| Administrative Staff | 1 | [#21] Scheduling, payroll, inter-site coordination covered by administrative overhead. |
Confidence Notes
Analyst notes provide detailed line items and ranges; however several costs are conditional (digitization, escalation) and transport/lease choices create variability, so overall confidence is medium.