SCP-6046
Unknown
~
medium confidence
SCP-6046
Expected annual
$1.2M
One-time setup
$2.5M
Annual recurring
$1.1M
Personnel
5
One-time setup and modification of facility and specialized equipment are the main upfront costs (~$2.47M), with recurring annual operations, staffing, inspection and incident-reserve costs driving ongoing costs (~$1.13M/yr).
One-Time Capital Costs
Total: $2.5M
Annual Recurring Costs
Total: $1.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.1M/yr
Normal year with steady-state operations, routine inspections, staffing and reserves; no major containment incidents.
no_incidents
routine_inspections
scheduled_research
🚨
Minor Incident
$1.3M/yr
Localized uncontained instance or small-scale loosening event requiring emergency response, localized repairs and limited downtime.
uncontained_instance_discovered
localized_fastener_failure
equipment_damage_repair
🚨
Catastrophic Structural Remediation
$2.6M/yr
Widespread dispersion of instances into structural members requiring major structural remediation, controlled demolition or multi-million-dollar repairs and extended shutdown.
multiple_instances_dispersed
structural_member_compromise
extended_shutdown_and_demolition
Personnel
5 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Containment Lead | 1 | [#6] Senior researcher assigned to containment and oversight (salary component included in staff_wages). |
| Technician | 1 | [#6] On-call technician for maintenance and experimental support (salary component included in staff_wages). |
| Security Officer / MTF Agent | 2 | [#6] Trained security staff familiar with SOPs (salary component included in staff_wages). |
| Engineer / Maintenance Liaison | 1 | [#6] Maintenance liaison coordinating inspections, repairs and contractor work (salary component included in staff_wages). |
Confidence Notes
Estimates are built from analyst-provided ranges and midpoint assumptions; many costs (structural remediation, incident frequency) are highly scenario-dependent so overall uncertainty is moderate.