SCP-6064
Thaumiel
~
medium confidence
SCP-6064
Expected annual
$4.0M
One-time setup
$7.3M
Annual recurring
$3.9M
Personnel
12
Initial one-time setup is front-loaded (dedicated wing, secure systems, vehicles, servers, and contingency) at roughly $7.33M; recurring yearly operations (staffing, research, utilities, legal/cover, safety) run roughly $3.88M/year, with personnel wages and research as the primary drivers.
One-Time Capital Costs
Total: $7.3M
Annual Recurring Costs
Total: $3.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.9M/yr
Normal year with ongoing operations, no major incidents; routine reseach, maintenance, training, and cover-up budget consumed.
no_public_incidents
steady hiring/training
routine operations only
🚨
Minor Public Incident
$4.1M/yr
One or more SCP-6064 instances appear publicly requiring additional field amnestics, PR remediation, and a small number of new instances to be processed.
public materialization
field amnestic deployment
small retrieval operation
🚨
Major Breach
$5.9M/yr
Significant containment failure or catastrophic event leading to many personnel deaths, mass materializations, large-scale retrieval and legal/PR costs.
site-level catastrophe
mass materialization
large recontainment and amnestic operations
🚨
Research Breakthrough Requiring Scale Up
$6.4M/yr
Operational decision to scale SCP-6064 use for Foundation projects, requiring rapid facility/IT expansion and recurring research hires.
high-value breakthrough
policy decision to scale use
rapid hiring and facility expansion
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#6] Six specialized guards to patrol and enforce non-interaction rules (6 × $78,000/yr included in staff_wages). |
| Medical Officer / Med Tech | 2 | [#10] Two med techs on duty to manage exhausted instances and staff emergency care (wages portion included in staff_wages). |
| Research Scientist / Verification Team | 4 | [#14] Four FTE verification/oversight researchers/managers (wages included in staff_wages). |
Confidence Notes
Line-item estimates are provided in analyst notes so totals are reasonably anchored, but scaling assumptions (per-instance growth rate, how many new instances per year, frequency of public incidents) are uncertain, so long-run projections carry moderate uncertainty.