SCP-6067 Unknown ~ medium confidence
SCP-6067
Expected annual
$6.3M
One-time setup
$61.2M
Annual recurring
$6.0M
Personnel
39
One-time capital costs are approximately $61,220,000 driven primarily by specialized containment construction, large contingency reserves for mass/volume growth and expansion, and heavy-equipment/neutralization reserves. Recurring annual operations are approximately $5,985,000/year driven by staff wages (security, technicians, researchers, engineers), administrative overhead, and ongoing maintenance/consumables.
🏗️ One-Time Capital Costs Total: $61.2M
Mass Volume Expansion Contingency $25.0M
[#15] Contingency planning reserve for construction of a larger containment wing if SCP-6067's effective volume expands beyond current chamber.
Containment Expansion Reserve $15.0M
[#31] Long-term growth/containment expansion reserve to cover multi-million-dollar expansions or emergency relocations.
Facilities $9.1M
[#1, #4, #25] Containment chamber construction, structural reinforcement of surrounding building section, and physical perimeter/anti-vehicle barriers (includes foundation/site work and perimeter hardening).
Insurance Liability Reserve $3.0M
[#18] Reserve for third-party damages / settlement fund (midpoint of provided range).
Transport And Capture $2.0M
[#16] Specialized heavy-lift/mobile containment and route security for initial or emergency transport (conditional estimate).
Neutralization Research Reserve $2.0M
[#27] Contingency research and testing fund for demolition / sapient-neutralization planning.
Equipment $1.5M
[#2, #3, #5, #6, #24, #29] HVAC setup, backup power/UPS hardware, high-speed/high-resolution monitoring suite, sensor/data-acquisition servers, communications security hardware, and initial PPE/equipment purchases.
Heavy Equipment Reserve $1.0M
[#26] Purchase/reserve of cranes, excavators, forklifts for emergency interventions (capital purchase/reserve).
Initial Research And Lab Setup $980K
[#19, #20, #21] Initial medical/forensic lab setup, initial research program budget, and initial controlled-feed sacrificial stock.
Specialized Robotic Systems $500K
[#12] Specialized remote robotic systems and sacrificial manipulators for non-contact observation and sampling.
Glass Replacement Reserve $500K
[#14] Initial reserve for custom laminated/polycarbonate panel replacement and spare panels.
Emergency Vehicles And Equipment $300K
[#11] One-time equipment purchase for rapid-reaction team vehicles and heavy deployment equipment.
Legal And Coverup Initial $200K
[#17] Initial legal/cover-up/OPSEC startup costs (document suppression, retainers).
Public Incident Response Initial $150K
[#30] Initial budget for public incident-response & misinformation (rapid cover story deployment).
🔄 Annual Recurring Costs Total: $6.0M/yr
Staff Wages $3.9M/yr
[#7, #8, #9, #10, #11] Salaries and loaded costs for security personnel, containment technicians, scientific staff, engineering & maintenance crew, and emergency response readiness/training.
Administrative Overhead $600K/yr
[#28] Program-level management, procurement, legal oversight and classified accounting overhead (estimated ~15% of recurring budget).
Research And Monitoring $455K/yr
[#5, #6, #20] Monitoring-suite maintenance, sensor/server maintenance/software licences, and recurring research program funding.
Facilities Maintenance $215K/yr
[#2, #3, #25] HVAC energy/maintenance, backup power fuel/testing/maintenance, and perimeter maintenance.
Glass Replacement Fund $200K/yr
[#14] Annual expected replacement/repair fund for laminated/polycarbonate panels exposed to abrasion and impacts.
Cover Story And Legal $150K/yr
[#17] Ongoing legal/cover-up, OPSEC retainer and related operations.
Supplies And Consumables $105K/yr
[#13, #21, #29] Consumables and filters (HEPA/cyclone), controlled-feed sacrificial stock replacement, and PPE replacement.
Specialized Robotics Maintenance $100K/yr
[#12] Maintenance, replacement, and servicing of specialized robotic systems.
Medical And Forensic Services $60K/yr
[#19] Ongoing medical, pathology, and forensic contracts for biological incorporations and analyses.
Training And Certifications $60K/yr
[#23] Annual staff training, simulated breach drills, and contractor trainers.
Public Incident Response $50K/yr
[#30] Ongoing media monitoring, rapid-response PR, and misinformation readiness.
Logistics And Transport $40K/yr
[#22] Waste handling and hazardous-material disposal logistics and contracts.
Periodic Certification $40K/yr
[#32] Third-party structural & safety certification and compliance audits.
Communications Security $30K/yr
[#24] Secure communications maintenance, redundancy, and classified comms costs.
Cost Scenarios
📊 Baseline (baseline) $6.0M/yr
87.5% probability / year
Normal operational year with routine maintenance, staffing, and research; no major containment incidents.
routine_operations scheduled_maintenance minor_research_activities
🚨 Minor Incident $6.2M/yr
10.0% probability / year +$250K vs baseline
Small ingestion or abrasion event requiring accelerated panel replacement and short-term repairs and overtime.
minor_ingestion_event localized_panel_damage sensor_alerts_triggering_repairs
🚨 Major Breach $11.0M/yr
2.0% probability / year +$5.0M vs baseline
Partial chamber breach or significant incorporation event requiring major repairs, temporary relocation of operations, and settlement/cleanup costs.
partial_chamber_breach significant_growth panel_ejection_or_structural_failure
🚨 Catastrophic Growth $36.0M/yr
0.5% probability / year +$30.0M vs baseline
Sustained uncontrolled growth / incorporation of large structures requiring construction of new containment wing and large-scale emergency measures.
sustained_uncontrolled_growth house-scale_or_larger_incorporation requirement_for_expansion_wing
👥 Personnel 39 total
Role Count Notes
Security Officer / MTF Agent 14 [#7] 12 armed guards (3x8hr shifts) plus 2 supervisory staff; wages included in staff_wages.
Containment Technician 8 [#8] Trained technicians to run systems, maintain seals, and operate airlocks; wages included in staff_wages.
Research Scientist 6 [#9] On-site researchers and fluid-dynamics specialists; wages included in staff_wages.
Engineer / Maintenance 4 [#10] Mechanical, structural and HVAC specialists for routine and emergency repairs; wages included in staff_wages.
Emergency Response / Rapid-Reaction Team 7 [#11] On-call breach containment and HAZMAT personnel (personnel/training/readiness costs included in staff_wages).
📋 Confidence Notes
Many line items are well-specified (construction, staffing, equipment) yielding moderate confidence, but several large ranges and low-probability high-impact contingencies (growth/neutralization) introduce significant uncertainty.
← SCP-6066 ↑ All SCPs SCP-6068 →