SCP-6080
Euclid-exsequi
~
medium confidence
SCP-6080
Expected annual
$2.4M
One-time setup
$490K
Annual recurring
$2.4M
Personnel
15
Initial setup and specialized containment (chamber refit, Faraday/air-gap, secure vault) are the main one-time costs (~$490k). Recurring costs are dominated by staffing (security, research, medical) and contingency pools (D-Class program, rehabilitation, liability), producing an estimated annual operating budget in the low millions.
One-Time Capital Costs
Total: $490K
Annual Recurring Costs
Total: $2.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.4M/yr
Normal, uneventful year with routine testing cadence and no major leaks or large-scale incidents.
routine D-Class testing
periodic duplication under safeguards
no unauthorized public exposure
🚨
Minor Incident
$2.5M/yr
Localized unauthorized viewing or small containment incident causing medical treatment, investigation, and limited public-removal work.
unauthorized viewing detected
small-scale Rerun Event affecting few personnel
🚨
Major Breach
$3.7M/yr
Serious viral leak or widespread unauthorized distribution of SCP-6080-1 leading to mass Rerun Events and large legal/medical/PR expenses.
viral online leak of SCP-6080-1
multiple affected civilians requiring large-scale response
Personnel
15 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#9] 24/7 posted guards covering shifts to secure Site-433 and Request Room 6080. |
| Research Scientist | 1 | [#10] Lead researcher responsible for SCP-6080 research and protocol oversight. |
| Research Assistant | 2 | [#10] RAs for monitoring/testing protocols and data collection. |
| Media Forensics Technician | 1 | [#10, #17] Specialist for provenance analysis and evidence forensics. |
| Medical Officer | 1 | [#11] On-call EMT/physician coverage for testing sessions and Rerun Event response. |
| Administrative Staff | 1 | [#21] Cataloguing, Request Room administration, and secure IT administration. |
| Engineer / Maintenance | 1 | [#2, #3, #4] Facility maintenance support for environmental controls, CCTV, and Faraday/air-gap systems. |
Confidence Notes
Many line items have wide ranges (e.g., D-Class program, liability reserves, legal takedowns, and Rerun Event medical severity). Core staffing and equipment costs are better defined; contingency/reserve estimates and incident probabilities are uncertain, producing medium confidence.