SCP-6109 Unknown ? low confidence
SCP-6109
Expected annual
$74.9M
One-time setup
$217.2M
Annual recurring
$67.9M
Personnel
33
One-time capital and endowment expenses dominate (site construction, contingency/endowment funds, and bullion/financial infrastructure ≈ $217M), while recurring annual operations (staff, temporal ops, logistics, program overhead) are the primary ongoing cost drivers at ≈ $67.9M/year.
🏗️ One-Time Capital Costs Total: $217.2M
Worst Case Contingency $100.0M
[#30] Rapid-response / surge-capability reserve for large-scale public exposure, mass discoveries, or retrocausal cascade requiring emergency global scale-up.
Decommissioning Endowment $50.0M
[#29] Endowment-style perpetual care fund to ensure indefinite custody and maintenance of indestructible remains.
Program Capital $20.0M
[#28] Program-level capital expenditure (medium-scale program) for aggregated containment infrastructure and program rollout.
Facilities $15.0M
[#1, #6] Hardened/radiation-rated vault construction and cleanroom/structural retrofits; includes HVAC/inert-atmosphere provision for vault(s) and cleanroom build/retrofit.
Contingency Reserve $10.0M
[#21] Seed contingency/reserve fund to cover uninsured anomalous exposure, lawsuits, or large economic impacts.
Equipment $9.7M
[#2, #3, #4, #5] Containment caskets and inert gloveboxes per specimen, heat-capture/capture-exhaust hardware, radiation instrumentation, and remote-handling robotics initial purchase.
Initial Research And Lab Setup $9.2M
[#10, #13, #20] Initial temporal integration/mission-support hardware, per-specimen forensic testing suite (aDNA, CT, isotopes) for catalog of specimens, and archival/data-security air-gapped server setup.
Gold Recovery Infrastructure $1.0M
[#14] Vacuum recovery units, assay lab, secure vaulting and initial infrastructure to collect and safely handle gold dust generated by specimens.
Community Compensation Fund $1.0M
[#25] Initial fund for community compensation, site restoration, or quiet relocation following recoveries at sensitive religious/cultural sites.
Legal And Financial Setup $800K
[#15, #16] One-time legal/compliance setup, creation of financial conduits/shell entities and initial legal/diplomatic case preparation costs.
Per Specimen Budget $500K
[#27] Representative short-form per-specimen acquisition + stabilization + first-year operations estimate (used for rapid budgeting of new finds).
🔄 Annual Recurring Costs Total: $67.9M/yr
Program Operational Budget $25.0M/yr
[#28] Aggregate ongoing program operating budget for medium-scale program oversight (staffing, retrieval, temporal ops, and overhead).
Research And Monitoring $20.1M/yr
[#10, #20] Ongoing temporal research & operations budget (using an existing classified program) and data-archive/secure-backup operations.
Logistics And Transport $6.5M/yr
[#7, #12] Secure transport/armored containment per recovery (air/ground + security) and field retrieval mission campaign costs (archaeological teams, excavation, escorts).
Reserve Replenishment $5.0M/yr
[#21, #30] Annual replenishment target for contingency/reserve funds and surge-capability reserves.
Staff Wages $4.5M/yr
[#8, #9, #18, #19] Salaries and benefits for security staff, specialized scientific personnel (forensic anthropologists, radiobiologists, ontokinetics experts), and permanent core operational staff.
Cover Story And Legal $2.5M/yr
[#15, #16, #17] Ongoing liaison office, legal/diplomatic engagement costs, covert information-control and media/PR operations.
Temporal Mission Provisioning $1.0M/yr
[#11] Retainers and provisioning for temporal agents and per-mission provisioning (training, period-appropriate supplies) averaged annually.
Incident Response Team $1.0M/yr
[#18] Standby rapid-response capability for new discoveries, hazardous-material intervention, and emergency containment equipment upkeep.
Market Stabilization Team $500K/yr
[#26] Economic monitoring and coordination team to manage bullion effects and liaise covertly with financial authorities if required.
Medical And Psych Support $400K/yr
[#19] Long-term medical surveillance, staff mental-health programs, hazard compensation and per-exposure follow-up.
Supplies And Consumables $300K/yr
[#24, #4] PPE, filters, seals, respirators, radiological consumables, periodic replacement of monitoring instrumentation and consumable supplies.
Energy And Utilities $300K/yr
[#22] Power for continuous inert atmosphere systems, cooling for heat-capture, robotics, lighting, and HVAC burdens.
Facilities Maintenance $200K/yr
[#3, #4, #5, #6] Maintenance and energy/maintenance for heat capture/scrubber systems, radiation instrumentation calibration, robotics upkeep, and cleanroom filters.
Bullion Custody And Insurance $200K/yr
[#14, #15] Ongoing custody fees, insurance, and secure-storage costs for recovered bullion.
Training And Exercises $200K/yr
[#23] SOP development, tabletop exercises, live drills, and specialized training (radiological, ontokinetics, religious sensitivity).
Public Compensation Annual $200K/yr
[#25] Annual budget for community compensation/mitigation for low-to-moderate incidents.
Cost Scenarios
📊 Baseline (baseline) $67.9M/yr
88.0% probability / year
Normal operating year with standard recoveries, routine missions, and no major public incidents.
routine_recovery_operations scheduled_temporal_activity_at_planned_level
🚨 Temporal Scaleup Mission $97.9M/yr
10.0% probability / year +$30.0M vs baseline
Year with one or more large temporal extraction/support missions requiring elevated per-mission spending and temporary surge staffing.
large_temporal_extraction multiple_high-cost_missions
🚨 Major Breach $267.9M/yr
2.0% probability / year +$200.0M vs baseline
Significant public exposure or mass-discovery event requiring emergency global scale-up, major PR/legal costs, emergency construction, and large financial stabilization actions.
public_exposure mass_discoveries retrocausal_event
👥 Personnel 33 total
Role Count Notes
Security Officer / MTF Agent 12 [#8] 24/7 armed security, perimeter guards and contractors for shift coverage.
Research Scientist 6 [#9] Senior scientists (radiobiologists, ontokinetics experts, forensic leads) on the core team.
Lab Technician 6 [#13, #5] Technicians for forensic testing, sample prep, and remote-handling operations.
Engineer / Maintenance 4 [#3, #5, #6] Engineers for heat-capture systems, robotics, HVAC and cleanroom maintenance.
Radiological Safety Officer 1 [#4] Dedicated RSO for dosimetry, monitoring, and safety compliance.
Medical Officer 1 [#19] Occupational medicine and exposure follow-up.
Incident Response Specialist 1 [#18] Rapid-response lead for site stabilizations and hazardous interventions.
Administrative Staff 2 [#16, #21] Office/admin support for legal liaison, financial accounting, and program administration.
Site Director / Executive Staff 1 [#28] Program/site leadership and executive oversight.
📋 Confidence Notes
Substantial uncertainties: unknown total specimen population, highly variable per-mission temporal costs, and unpredictable economic/legal effects of gold conversion. Many top-line items (temporal R&D, surge reserves, endowment size) are wide-range estimates from analyst notes.
← SCP-6108 ↑ All SCPs SCP-6110 →