SCP-6124
Euclid
~
medium confidence
SCP-6124
Expected annual
$13.7M
One-time setup
$24.5M
Annual recurring
$13.5M
Personnel
42
Initial capital/setup is moderate (primarily site and lab fit-out plus specialized recovery gear) while the main recurring costs are embedded OPSEC staffing, covert acquisition funds, logistics (transport/rapid-recovery) and legal/PR/insurance; baseline annual operations are roughly $13.5M with potential one-time disclosure contingencies of $5–20M.
One-Time Capital Costs
Total: $24.5M
Annual Recurring Costs
Total: $13.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$13.5M/yr
Normal uneventful year with routine monitoring, embedded programs, research, acquisition fund usage at baseline levels and no major public disclosures.
no_public_discovery
routine_field_activity
steady embedded_program_operations
🚨
Minor Incident
$14.7M/yr
Localized or limited public discovery of a REAO-6124-A specimen requiring rapid acquisition, focused PR/DM and legal actions.
single_public_specimen_discovery
local_media_coverage
rapid_acquisition_needed
🚨
Major Disclosure
$23.5M/yr
Widespread public disclosure of a significant REAO-6124-A fossil requiring global emergency response, large acquisitions, international legal/diplomatic action and major PR buy.
viral_media_exposure
international_claims
simultaneous multiple discoveries
Personnel
42 total
| Role | Count | Notes |
|---|---|---|
| OPSEC Analyst | 6 | [#1] Monitoring unit analysts for publications/social media; count taken from note #1. |
| SRE / Engineer | 2 | [#1] Site reliability/automation engineers supporting OPSEC tooling per note #1. |
| OPSEC Manager | 1 | [#1] Manager for the monitoring unit per note #1. |
| Embedded Agent / Research Fellow | 15 | [#2] Embedded personnel inside civilian paleontology projects (10–20 listed in #2); midpoint used. |
| Field Recovery Specialist / Technician | 8 | [#5] Rapid-recovery field response team members and technicians; salaries included in recurring staff line items for #5. |
| Research Scientist | 4 | [#6] Research scientists for lab program (3–6 researchers indicated in #6); conservative midpoint used. |
| Lab Technician | 2 | [#6] Technical support staff for research operations and scanning workflows per note #6. |
| Curator / Conservator | 3 | [#18] Long-term curation staff for specimens (2–4 per major specimen/site indicated in #18); midpoint used. |
| Administrative Staff | 1 | [#1, #2] Administrative/covert-program support and coordination included in staff totals per notes #1 and #2. |
Confidence Notes
Analyst notes provide detailed line-item ranges allowing reasonable mid-point estimates, but substantial uncertainty remains due to per-incident variability (specimen acquisition amounts, scale of disclosures) and contingent future discoveries which could drive costs orders of magnitude higher.