SCP-6139
Euclid
~
medium confidence
SCP-6139
Expected annual
$1.6M
One-time setup
$2.1M
Annual recurring
$1.5M
Personnel
14
First-year capital (one-time) costs are approximately $2.11M, driven by cell construction, specialized equipment, and contingency reserves; recurring annual costs are roughly $1.52M/year, dominated by security/personnel wages, medical response, and research/data retention.
One-Time Capital Costs
Total: $2.1M
Annual Recurring Costs
Total: $1.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.5M/yr
Normal operating year with no major containment incidents; recurring costs only.
no major breach
routine incidents handled under normal operations
🚨
Minor Incident
$1.7M/yr
Localized breach or retrieval event requiring extra medical treatment, overtime, temporary repairs, and increased legal/amnestic expenses.
localized containment breach
multiple victim treatments above baseline
temporary equipment replacement/repair
🚨
Major Breach
$2.5M/yr
Significant containment failure causing facility damage, broad exposure, legal exposure, and major rebuild/repair and replacement costs.
cell structural damage
widespread civilian exposure or high-profile leak
major equipment loss or vehicle loss
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#9] 24/7 guards (3 shifts) to maintain continuous security presence. |
| Response Specialist / Containment Specialist | 3 | [#9] Trained rapid-response specialists for retrievals and UV deployment. |
| Medical Officer / Nurse | 1 | [#10, #11] Dedicated on-site nurse/medic for immediate treatment and sedation monitoring; physician retained on-call (not counted as full headcount). |
| Research Scientist / Data Analyst | 2 | [#14, #16, #15] Researchers and data scientists for pattern reconstruction, imaging, and laboratory analysis. |
| Engineer / Maintenance | 1 | [#6, #7, #19] On-call engineer for HVAC/generator/structural systems and maintenance coordination. |
| Administrative Staff | 1 | [#20, #28] Program admin for cover-story coordination, scheduling, and facility administration. |
Confidence Notes
Analyst notes provide detailed line items and ranges enabling a reasoned estimate, but many items have wide ranges (equipment counts, vehicle quantity, reserve sizing, and incident frequency), so uncertainty remains; medium confidence.