SCP-614
Euclid
~
medium confidence
SCP-614
Expected annual
$4.0M
One-time setup
$7.7M
Annual recurring
$3.9M
Personnel
12
Estimated initial one-time setup and contingency requirements are approximately $7,651,000, driven mainly by a large escalation/reserve fund and equipment/setup costs. Ongoing annual operations are roughly $3,861,000/year, driven by staff wages, ISP cooperation/sinkhole services, continuous monitoring, and research/monitoring expenses.
One-Time Capital Costs
Total: $7.7M
Annual Recurring Costs
Total: $3.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.9M/yr
Normal year with staffed SOC, monitoring, ISP cooperation, routine takedowns, and ongoing research without major incidents.
routine_monitoring
targeted_takedowns
no_public_exposure
🚨
Minor Incident
$4.4M/yr
Localized leak or targeted exposure requiring elevated takedown effort, additional legal action, contractor IR engagement, and increased PR response.
localized_leak
major_takedown_campaign
temporary_public_attention
🚨
Physical Seizure
$5.1M/yr
Server located and physically seized (international coordination), requiring major legal work, travel, secure transport, and deep forensic contracting.
host_seized
international_coordination
major_forensic_engagement
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Research Analyst | 2 | [#1] Senior analysts to run investigations and research. |
| Network Engineer | 2 | [#1] Engineers to manage BGP/sinkhole, peering, and monitoring infrastructure. |
| Cyber-ops Lead | 1 | [#1] Technical lead coordinating cyber operations and incident response. |
| SOC Operator | 4 | [#1] Operators providing 24/7 monitoring and alert response shifts. |
| Legal Liaison / Counsel | 1 | [#1] Legal support for takedowns, MLATs, and rapid filings. |
| Field Investigator / Agent | 1 | [#1] Field agent for datacenter investigations and physical operations. |
| Administrative Staff | 1 | [#1] Coordination, logistics, and liaison management. |
Confidence Notes
Estimates are midpoints of wide analyst ranges; many costs are jurisdiction-dependent and scenario-driven (large reserves and one-time emergency expenses introduce substantial uncertainty).