SCP-6166
Safe
~
medium confidence
SCP-6166
Expected annual
$998K
One-time setup
$1.0M
Annual recurring
$969K
Personnel
9
One-time capital costs are dominated by heavy lead shielding, structural reinforcement, and specialized instrumentation (HPGe, cameras, robotics). Recurring costs are dominated by security staffing, medical/nursing oversight, waste handling, and a long-term sequestration surcharge, yielding substantial annual operating expenses.
One-Time Capital Costs
Total: $1.0M
Annual Recurring Costs
Total: $969K/yr
Cost Scenarios
📊
Baseline
(baseline)
$969K/yr
Normal year with routine operations, scheduled maintenance, and no containment incidents.
steady-state operations
no incidents
routine waste disposal and calibration
🚨
Minor Incident
$1.0M/yr
Localized contamination or equipment failure requiring emergency response, additional waste removal, short-term medical treatment and repairs.
localized contamination
equipment failure requiring contractor response
small medical exposures
🚨
Major Breach
$2.2M/yr
Significant containment breach or exposure event requiring major containment upgrades, extended facility downtime, litigation and large-scale medical response.
structural failure or large-scale contamination
staff mass exposure
regulatory/legal action and major remediation
Personnel
9 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#14] 24/7 security staffing (2 per shift; six positions total) per analyst estimate. |
| Research Scientist | 1 | [#19] One research lead/scientist supporting characterization and ongoing studies (salary included in staff_wages). |
| Medical Officer | 1 | [#11, #13] Part-time or fractional nurse/medical monitor responsible for IV maintenance, catheter care and vitals checks. |
| Radiation Safety Officer (RO) / Health Physics | 1 | [#15] Fractional RSO oversight (0.1–0.25 FTE equivalent budgeted) but counted as one position for responsibility and oversight. |
Confidence Notes
Estimates are based on analyst-provided ranges and typical Foundation procurement patterns; many items (waste disposal regime, indefinite storage needs, HPGe configuration, exact staffing model) have wide ranges, producing moderate confidence.