SCP-6168
Safe
~
medium confidence
SCP-6168
Expected annual
$186K
One-time setup
$314K
Annual recurring
$182K
Personnel
4
Initial (one-time) setup costs focused on containment retrofit, specialized testing equipment and contingency reserves total roughly $314k; annual recurring costs (~$182k/year) are dominated by staff wages (security + research) and ongoing monitoring/maintenance.
One-Time Capital Costs
Total: $314K
Annual Recurring Costs
Total: $182K/yr
Cost Scenarios
📊
Baseline
(baseline)
$182K/yr
Normal uneventful year with scheduled monitoring, maintenance, research and no major incidents.
routine monitoring
scheduled maintenance
🚨
Minor Incident
$192K/yr
Localized non-catastrophic issue (e.g., pest detection, minor conservation event, small transport or repair) requiring limited emergency spending.
pest outbreak
localized structural damage
🚨
Field Investigation
$225K/yr
Deployment of a small field team to locus (Phú Quốc/Yên Bái) for investigation, permits and on-site data collection.
new leads at locus
need for on-site sample collection
🚨
Major Breach
$332K/yr
Significant containment failure or contested seizure requiring emergency containment upgrades, emergency transport, legal response and potential asset recovery.
break-in/theft attempt
unexpected behavioral escalation
Personnel
4 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 1 | [#4] Represents the dedicated day-shift guard (0.6 FTE funded equivalent; supplemented by roving/night shift staff shared with site). |
| Research Scientist / PI | 1 | [#12] PI oversight for behavioral/ethology study; part of the research staffing budget. |
| Research Assistant | 1 | [#12] Research assistant time (0.5–1.0 FTE project-length) included in research staffing budget. |
| Administrative Staff | 1 | [#16] Administrative / POI monitoring support (translation, liaison) included in staff wages. |
Confidence Notes
Many line items are standard conservation and security costs (medium confidence), but thaumaturgic testing and incident-driven expenditures are highly variable and introduce uncertainty.