SCP-6188
Safe
~
medium confidence
SCP-6188
Expected annual
$3.2M
One-time setup
$3.8M
Annual recurring
$3.0M
Personnel
12
Estimated one-time capital costs of roughly $3.81M primarily driven by contingency funds, potential relocation/exploitation capital and equipment; recurring annual costs are approximately $3.01M/yr driven by staff wages, research/forensic operations, and optional long-term research station operations.
One-Time Capital Costs
Total: $3.8M
Annual Recurring Costs
Total: $3.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.0M/yr
Normal uneventful year with standard operations, testing at the current pace, and maintenance of cover story.
no major incidents
regular testing cadence
ongoing cover maintenance
🚨
Minor Incident
$3.2M/yr
A localized incident (trespasser discovery, single severe returnee) requiring emergency response, extra forensics and modest PR/legal response.
trespasser discovered
single mutilated returnee requiring extended forensics
small media attention
🚨
Major Breach
$4.3M/yr
Significant containment failure or series of incidents causing multiple casualties, heavy forensic workload, major repairs and substantial PR/legal expenses.
extended 'hunt' activity
multiple returned mutilated victims
significant public exposure
🚨
Research Breakthrough Requiring Scale Up
$5.1M/yr
Decision to aggressively research/exploit SCP-6188-1 (build station, scale personnel and operations).
policy decision to exploit endless food/water or SCP-6188-2 biology
approval to build permanent research station
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | Permanent on-site 'memorial guards' providing two-person coverage across shifts (6 guards to cover 24/7 rotations). |
| Rapid Response / MTF Agent | 6 | Regional containment/recovery team (4–8 operatives assumed 6) on-call for incidents and retrievals; salaries included in staff_wages. |
Confidence Notes
Analyst notes are detailed and cover most cost drivers (site control, security, sensors, testing, and contingencies), but several items are highly conditional (station build, attempted-move mitigation, size/frequency of tests and forensic cases) so totals rely on mid-range assumptions; this yields medium confidence.