SCP-6213 Unknown ~ medium confidence
SCP-6213
Expected annual
$3.2M
One-time setup
$6.5M
Annual recurring
$3.1M
Personnel
15
First-year setup (one-time) is estimated at roughly $6.49M driven by land acquisition, a contingency reserve and optional vault/construction; annual recurring costs are ~ $3.08M/yr driven primarily by staff wages (security and scientific teams), MTF readiness and ongoing research/monitoring.
🏗️ One-Time Capital Costs Total: $6.5M
Containment Vault $2.0M
[#12] Containment vault / full enclosure (optional/engineering capital if required).
Facilities $1.4M
[#2, #5, #11, #28] Site acquisition/land control, perimeter security construction, structural stabilization and road/site access improvements (one-time capital).
Contingency Fund $1.2M
[#26] Contingency / breach response fund reserved capital for major containment failure, litigation or accelerated remediation.
Equipment $680K
[#6, #14, #18, #15, #16, #19, #25] CCTV/access control and hardened hardware, robotics & remote-entry systems, vehicles/trailers capital purchases, power infrastructure capital, communications installation, onsite modular accommodations capital/outfitting, emergency extraction equipment (one-time capital).
Decommissioning $500K
[#30] Decommissioning and site remediation (end-of-program demolition, remediation, legal closure).
Initial Research And Lab Setup $275K
[#13] Specialized instrumentation for temporal measurement and initial lab buildout/equipment for research.
Legal And Cover Setup $175K
[#3] One-time legal, permitting, cover-story setup, shell companies, initial PR and buyouts.
Initial Recon Deployment $125K
[#1] Initial reconnaissance & emergency deployment: rapid-response team travel, per-diems, gear, short-term lodging and initial instrumentation placement.
Env Remediation $55K
[#20] Environmental remediation / hazardous material abatement (asbestos, lead, mold, contaminated soils).
Training Initial $35K
[#22] Specialized training and initial drills (instructor fees, travel for initial certification).
🔄 Annual Recurring Costs Total: $3.1M/yr
Staff Wages $1.4M/yr
[#7, #9, #10] Guard force (24/7 security coverage salaries/benefits), onsite scientific & technical staff salaries, medical personnel/onsite medics and health surveillance.
Research And Monitoring $740K/yr
[#17, #23, #24, #16, #22] Data storage/processing/archival, directed research program costs and collaborators, laboratory analysis and sample storage, communications service fees (satellite/service), ongoing refresher training and drills.
Mobile Task Force Readiness $400K/yr
[#8] Mobile Task Force / rapid response readiness: surge pay, specialized equipment, training and standby travel (recurring posture costs).
Facilities Maintenance $155K/yr
[#15, #19, #28] Power fuel & generator maintenance, onsite accommodations utilities/maintenance, road and access maintenance.
Cover Story And Legal $125K/yr
[#4, #29] Ongoing legal/PR/takedown operations, FOIA responses, online monitoring and social-media suppression contracts.
Instrument Replacement $125K/yr
[#27] Instrument replacement / depreciation fund for timekeeping, optical and other specialized sensors (planned replacement/upgrades).
Logistics And Transport $85K/yr
[#18, #25] Vehicle fuel & maintenance, contracted emergency extraction/airlift/ambulance standby and transport logistics.
Supplies And Consumables $30K/yr
[#21] Consumables, PPE, medical supplies, batteries, replacement filters and sampling kits.
Cost Scenarios
📊 Baseline (baseline) $3.1M/yr
83.0% probability / year
Normal year with routine operations, no major incidents.
routine operations no breach scheduled research
🚨 Minor Incident $3.3M/yr
15.0% probability / year +$200K vs baseline
Localized containment incident requiring overtime, repairs, limited remediation and increased PR response.
civilian trespass small breach or equipment failure heightened media attention
🚨 Major Breach $6.1M/yr
2.0% probability / year +$3.0M vs baseline
Significant containment failure or discovery requiring major emergency construction, remediation, legal action and large contingency draw.
containment breach structural collapse or uncontrolled temporal propagation major litigation or public exposure
👥 Personnel 15 total
Role Count Notes
Security Officer / MTF Agent 10 [#7] Full-time guard force for 24/7 coverage (rotations, leave) included in staff wages.
Research Scientist 4 [#9] Onsite scientific & technical staff (physicists, engineers, temporal researchers) included in staff wages.
Medical Officer 1 [#10] Onsite/contracted medic for screening and long-term monitoring included in staff wages.
📋 Confidence Notes
Estimates are based on analyst ranges and the SCP description; major uncertainties remain around whether a full sealed vault is required and local land costs, so figures are midpoint-based rather than narrowly confidence-increased.
← SCP-6212 ↑ All SCPs SCP-6214 →