SCP-6219
Pending
~
medium confidence
Abnormality-6219
Expected annual
$1.6M
One-time setup
$698K
Annual recurring
$1.6M
Personnel
12
Initial capital/setup is approximately $697,500 driven by construction, specialized locking/HSM hardware, and IT/security development; recurring annual costs are about $1.58M driven primarily by security staffing, DoMC oversight, MTF readiness and IT/documentation support.
One-Time Capital Costs
Total: $698K
Annual Recurring Costs
Total: $1.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.6M/yr
Normal year with standard operations, scheduled maintenance, and no major incidents.
no incidents
routine maintenance
occasional authorized entries
🚨
Minor Incident
$1.7M/yr
Localized incident requiring MTF response, overtime, small repairs, and invocation of legal/cover funds.
unauthorized access attempt
power glitch requiring verification
small sensor/lock repair
🚨
Major Breach
$2.6M/yr
Significant containment breach or site-wide incident involving casualties, major repairs, extended MTF deployment, and legal exposure.
site-wide power failure
containment breach
extended recovery & repairs
🚨
Political Exposure
$2.1M/yr
Information leak or public exposure requiring heavy legal defense, PR operations, and potential relocation/upgrades.
public disclosure
regulatory/legal action
media/political attention
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#7] Armed security posted outside chamber 24/7; 2 guards per shift, three shifts = 6 FTE. |
| DoMC Specialist | 2 | [#8] DoMC/memetics oversight team (1–3 specialists); midpoint used. |
| Administrative Staff | 2 | [#9, #22] Administrative and authorization facilitation, record redaction and meeting facilitation. |
| Engineer / Maintenance | 1 | [#5, #6, #19] On-call engineering/maintenance support for HVAC, UPS, and routine inspections (pro-rated). |
| Site Director / Executive Staff | 1 | [#21] Pro-rated facility/site executive overhead attributable to object. |
Confidence Notes
Containment and operational requirements are well-described (windowless chamber, 13-person authorization, semiontological controls) so primary cost drivers are identifiable; many line items have wide ranges and depend on posture choices (physical convening vs crypto multisig), so numerical estimates use midpoints and thus carry moderate uncertainty.