SCP-6219 Pending ~ medium confidence
Abnormality-6219
Expected annual
$1.6M
One-time setup
$698K
Annual recurring
$1.6M
Personnel
12
Initial capital/setup is approximately $697,500 driven by construction, specialized locking/HSM hardware, and IT/security development; recurring annual costs are about $1.58M driven primarily by security staffing, DoMC oversight, MTF readiness and IT/documentation support.
🏗️ One-Time Capital Costs Total: $698K
Equipment $464K
[#2, #3, #4, #5, #10, #11, #14, #17, #20] Multi-authority locking/HSMs, external sensor suite install, adjacent CCTV install, UPS/transfer switch, info-security development, secure archival setup, forensics equipment, alarm integration install, and IT logging/audit setup (one-time development/hardware costs; mid-point estimates).
Facilities $158K
[#1, #6, #23] Containment chamber build-out, HVAC zone installation, and anteroom/signage/locked entry infrastructure; mid-point of provided ranges used.
Archaeological Investigation $75K
[#15] One-time investigative project (structural/archival investigation into sealed room and blueprint anomalies).
Initial Research And Lab Setup $0
[] Testing and autopsy explicitly prohibited; no lab/research setup costs applicable.
🔄 Annual Recurring Costs Total: $1.6M/yr
Staff Wages $850K/yr
[#7, #8, #21, #22] Security guards (6 FTE), DoMC/memetics oversight staff (midpoint 2 FTE), pro-rated site overhead salaries, and record redaction/legal admin labor (midpoint sums).
Logistics And Transport $368K/yr
[#9, #16, #24] Authorization overhead (meeting/secure communications), MTF/mobile response readiness and travel/retention, and annual training/tabletop exercises.
Contingency Fund $206K/yr
[#25] Contingency / escalation reserve (~15% of operational recurring budget; midpoint of 10–20% guidance).
Cover Story And Legal $62K/yr
[#18] Legal retainer, covert cover-story and PR contingency fund.
Facilities Maintenance $44K/yr
[#3, #4, #5, #6, #17, #19] Ongoing maintenance and inspections: external sensors, adjacent CCTV, UPS maintenance, HVAC energy & maintenance, alarm/monitoring maintenance, and routine inspection/compliance audits.
Research And Monitoring $38K/yr
[#10, #20] Ongoing info-security/support and IT logging/audit support for memetic-safe record systems and secure comms.
Supplies And Consumables $6K/yr
[#11, #13] Archival storage rotation and consumable PPE/disposable entry supplies.
Psychological Screening $6K/yr
[#12] Psychological screening, memetic inoculation training, and periodic evaluations for staff with access/monitoring duties.
Cost Scenarios
📊 Baseline (baseline) $1.6M/yr
93.5% probability / year
Normal year with standard operations, scheduled maintenance, and no major incidents.
no incidents routine maintenance occasional authorized entries
🚨 Minor Incident $1.7M/yr
5.0% probability / year +$120K vs baseline
Localized incident requiring MTF response, overtime, small repairs, and invocation of legal/cover funds.
unauthorized access attempt power glitch requiring verification small sensor/lock repair
🚨 Major Breach $2.6M/yr
1.0% probability / year +$1.0M vs baseline
Significant containment breach or site-wide incident involving casualties, major repairs, extended MTF deployment, and legal exposure.
site-wide power failure containment breach extended recovery & repairs
🚨 Political Exposure $2.1M/yr
0.5% probability / year +$500K vs baseline
Information leak or public exposure requiring heavy legal defense, PR operations, and potential relocation/upgrades.
public disclosure regulatory/legal action media/political attention
👥 Personnel 12 total
Role Count Notes
Security Officer / MTF Agent 6 [#7] Armed security posted outside chamber 24/7; 2 guards per shift, three shifts = 6 FTE.
DoMC Specialist 2 [#8] DoMC/memetics oversight team (1–3 specialists); midpoint used.
Administrative Staff 2 [#9, #22] Administrative and authorization facilitation, record redaction and meeting facilitation.
Engineer / Maintenance 1 [#5, #6, #19] On-call engineering/maintenance support for HVAC, UPS, and routine inspections (pro-rated).
Site Director / Executive Staff 1 [#21] Pro-rated facility/site executive overhead attributable to object.
📋 Confidence Notes
Containment and operational requirements are well-described (windowless chamber, 13-person authorization, semiontological controls) so primary cost drivers are identifiable; many line items have wide ranges and depend on posture choices (physical convening vs crypto multisig), so numerical estimates use midpoints and thus carry moderate uncertainty.
← SCP-6218 ↑ All SCPs SCP-6220 →