SCP-6229
Keter
~
medium confidence
SCP-6229
Expected annual
$7.6M
One-time setup
$90.5M
Annual recurring
$7.3M
Personnel
34
Estimated one-time capital costs are approximately $90.5M, driven primarily by procurement/installation of six Scranton Reality Anchors (SRAs) and long-term capital reserves. Recurring annual costs are roughly $7.3M/yr, driven by staff wages, SRA energy/maintenance, and administrative/insurance overhead.
One-Time Capital Costs
Total: $90.5M
Annual Recurring Costs
Total: $7.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$7.3M/yr
Normal uneventful year with no major incidents: routine operations, maintenance and staffing.
no_incident
routine_maintenance
🚨
Minor Incident
$7.6M/yr
Small demanifestation or SRA activation requiring minor repairs, generator fuel use, and limited legal/cover actions.
SRA_activation
minor_demanifestation
small_repair
🚨
Major Breach
$9.8M/yr
Significant demanifestation event damaging infrastructure and requiring multi-unit SRA repairs, forensic cleanup and notable cover-up/legal costs.
multi-SRA_damage
extended_repair
major_coverup
🚨
Catastrophic Breach
$27.3M/yr
Rare catastrophic failure or large-scale exposure requiring full capital replacement, site relocation/decommissioning and extensive legal/cover-up payouts.
full_SRA_failure
public_exposure
site_decommissioning
Personnel
34 total
| Role | Count | Notes |
|---|---|---|
| Monitoring Operator | 7 | [#9] Continuous video feed operators covering 24/7 shifts (6–8 FTEs estimated). |
| Security Officer / MTF Agent | 9 | [#10] On-site containment guards for 24/7 cell security (6–12 guards estimated). |
| Dedicated Agent Team | 12 | [#11] Agents assigned to monitor Weylin and Rebecca continuously (12–15 agents hired to maintain 3 per shift). |
| Research Scientist | 4 | [#16] Dedicated researchers studying incorporeal properties and cross-testing (3–6 staff estimated). |
| Research Technician | 1 | [#15, #16] Technician support for humetic instruments and experimental setups. |
| Specialized Technician (SCP-6229-1 maintenance) | 1 | [#14] Technician(s) for suit storage, servicing and component repairs. |
Confidence Notes
Many line items are high-variance (SRA unit pricing, failure rates, and long-term replacement planning). Notes provide ranges and clear dominant cost drivers, enabling a medium-confidence estimate but significant uncertainty remains in incident frequencies and SRA pricing.