SCP-6286
Unknown
~
medium confidence
SCP-6286
Expected annual
$1.4M
One-time setup
$2.8M
Annual recurring
$1.4M
Personnel
10
First-year one-time setup (property purchase, Level-6 locker fabrication and installation, transport/vehicle, and site renovations) dominates costs at about $2.8M; recurring annual costs (~$1.4M) are driven by staffing (security, medical, religious vetting) and ongoing hermetic/environmental maintenance.
One-Time Capital Costs
Total: $2.8M
Annual Recurring Costs
Total: $1.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.4M/yr
Normal year with no containment incidents; routine operations, staff wages, maintenance, research, and cover operations continue as planned.
steady containment
no breaches
regular maintenance
🚨
Minor Incident
$1.6M/yr
A localized incident (equipment failure, minor breach attempt, suspected possession event affecting a staff member) requiring repair, overtime, temporary increased medical/clerical response and PR/legal work.
equipment failure
isolated possession event
minor public exposure
🚨
Major Breach
$4.9M/yr
Significant containment failure or public exposure requiring full containment rebuild/replacement of Level-6 locker, major legal/PR response, potential relocation/airlift and extended operations.
catastrophic equipment failure
coordinated breach
large-scale public revelation
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 7 | Six guards plus one supervisor for 24/7 coverage; corresponds to item #6 salary estimates. |
| Containment Technician / Technical Keeper | 1 | One full-time technician responsible for monitoring systems and locker operations (item #7). |
| Chaplain / Religious Vetting Officer | 1 | Onsite or on-call chaplain for vetting and ritual oversight (item #8). |
| Medical Officer | 1 | Medical/psychiatric monitoring staff responsible for routine screening and anti-possession readiness (item #10). |
Confidence Notes
Estimates are based on analyst ranges and midpoints; SCP-6286 has anomalous/possession risks and site-specific factors (rural Orkney) that make costs variable. One-time construction and bespoke Level-6 hardware are reasonably well scoped, but probabilities of incidents and long-term maintenance needs are uncertain.