SCP-6311
Euclid
~
medium confidence
SCP-6311
Expected annual
$3.9M
One-time setup
$4.9M
Annual recurring
$3.8M
Personnel
16
Initial setup is dominated by relocation and construction of a purpose-built containment chamber and specialized equipment (drones, generators, surveillance). Recurring costs are driven by staff wages, intelligence exploitation, emergency readiness, and ongoing consumables (meat procurement, biohazard handling, maintenance).
One-Time Capital Costs
Total: $4.9M
Annual Recurring Costs
Total: $3.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.8M/yr
Normal year with routine operations, weekly drone maintenance, occasional low-use negotiations, and no major incidents.
routine_maintenance
scheduled_negotiations
no_incidents
🚨
Minor Incident
$4.0M/yr
Localized incident such as a negotiator disappearance or single significant containment incident requiring forensics, targeted amnestics, and short-term surge in response assets.
single_disappearance
forensic_investigation
amnestic_event
🚨
Major Breach
$5.8M/yr
Significant breach or catastrophic event: multiple personnel lost, large-scale extraction, major legal exposure and drawdown of reserve funds for international mitigation.
multi_personnel_loss
international_incident
reserve_draw
Personnel
16 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#7] Dedicated security detail for 24/7 coverage, supervisors and rotation included in wage estimates. |
| Research Scientist | 4 | [#8] Level-3+ negotiators, folklore specialists, and structural engineers responsible for negotiations and analysis. |
| Drone Technician / Operator | 3 | [#4] Operators and technicians to run inspection/manipulator drones and remote masonry maintenance. |
| Site Director / Program Manager | 1 | [#25] Site/program manager and executive liaison overseeing containment and budgets. |
Confidence Notes
Analyst notes provide detailed line-item ranges for most costs enabling midpoint estimates, but incident frequencies, reserve sizing, and exploitation spend are uncertain, producing medium confidence in the final aggregated figures.