SCP-6318
Unknown
?
low confidence
SCP-6318
Expected annual
$10.2M
One-time setup
$22.1M
Annual recurring
$9.6M
Personnel
32
Initial one-time stabilization, infrastructure and remediation costs are estimated at approximately $22.1M, driven primarily by asset write-offs, contingency reserves, demolition/retrofit and mock-facility construction; recurring annual costs are approximately $9.6M/yr driven by lost revenue, satellite leasing, staff wages, research, and logistics.
One-Time Capital Costs
Total: $22.1M
Annual Recurring Costs
Total: $9.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$9.6M/yr
Normal operational year with satellite operations, research ongoing, and no major incidents.
no_major_breach
steady_research_and_leasing
routine_remediation
🚨
Minor Incident
$10.6M/yr
Localized contamination or loss requiring targeted remediation, asset replacement, and surge logistics.
localized_spread
targeted_asset_losses
short-term_surge_cleanup
🚨
Major Breach
$19.6M/yr
Significant breach requiring demolition/large-scale remediation, major asset write-offs and extended relocation.
structural_instability_from_destruction
spread_to_multiple_facilities
large_asset_loss
🚨
Political Exposure
$11.6M/yr
Public exposure or legal/political intervention requiring extensive cover-up, compensations, and heightened operations.
media_leak
local_government_involvement
litigation_or_compensation
🚨
Catastrophic Regional Spread
$34.6M/yr
Worst-case expansion beyond Site-106 requiring regional public-health response and multi-site remediation.
uncontrolled_spread
public_health_emergency
multi-site_remediation
Personnel
32 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 20 | [#4] Additional guards for 24/7 security of relocated assets and during transfer missions; count chosen within the 10–30 range and costs folded into staff_wages. |
| Psychometrist | 4 | [#5] Foundation psychometrists for certification and on-call coverage; team size chosen within recommended 3–6 and costs included in staff_wages. |
| Administrative Staff / Logistics | 6 | [#1, #19] Admin/logistics personnel handling increased audit, item authentication backlog, and relocation admin; costs included in staff_wages. |
| Engineer / Maintenance | 2 | [#13, #7] Engineers/maintenance staff supporting containment retrofits, facility systems, and equipment upkeep; wages included in staff_wages. |
Confidence Notes
Estimates are low-confidence due to wide ranges in analyst notes (large uncertainty in asset write-offs, demolition scope, and potential for escalation), limited precise unit counts, and high variance in possible operational choices (demolish vs quarantine vs long-term research).