SCP-6320
Euclid
~
medium confidence
SCP-6320
Expected annual
$2.9M
One-time setup
$9.5M
Annual recurring
$2.8M
Personnel
13
One-time capital (underground remediation, equipment, and contingency) ≈ $9.52M; steady-state recurring operations (staff, maintenance, research, insurance, consumables) ≈ $2.80M/year. Main drivers: underground remediation, contingency/entombment reserve, instrumentation/R&D and ongoing staffing.
One-Time Capital Costs
Total: $9.5M
Annual Recurring Costs
Total: $2.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.8M/yr
Normal operational year with scheduled cleaning, maintenance, research and no major incidents.
routine_operations
scheduled_maintenance
ongoing_research
🚨
Minor Incident
$3.4M/yr
Localized containment event (lost equipment, small breach of exclusion radius, temporary evacuation, extra cleanup and repair) requiring incident response and overtime.
localized_disappearance_of_equipment
temporary_breach_of_exclusion_radius
small_tremors_and_evacuation
🚨
Major Breach
$10.8M/yr
Severe containment failure (site-level disappearance, large-scale breach) requiring emergency entombment/isolation, large mobilization and legal/compensation expenses.
site_disappearance
catastrophic_containment_failure
large_scale_evacuations
Personnel
13 total
| Role | Count | Notes |
|---|---|---|
| Maintenance / Cleaning Crew | 4 | [#4] Trained cleaning crew to meet required cleaning frequency and shift coverage (3–4 FTE assumed as 4). |
| Security Officer / MTF Agent | 6 | [#7] Additional perimeter security and rapid-response team (4–8 FTE assumed as 6). |
| Research Scientist / Engineer | 3 | [#18, #6] On-site scientists and engineers dedicated to non-contact research and instrumentation (2–5 FTE assumed as 3). |
Confidence Notes
Midpoint estimates used across wide-ranging underground construction, robotics and anomalous-research line items. Containment behaviour and extreme one-time contingency needs are uncertain (wide ranges in notes); staff and steady-state maintenance estimates are better constrained.