SCP-6329
Euclid
~
medium confidence
SCP-6329
Expected annual
$27.0M
One-time setup
$80.3M
Annual recurring
$26.8M
Personnel
140
Initial one-time capital is approximately $80,340,000 driven primarily by land acquisition, site construction/geotechnical work, containment reserve and contingency; recurring annual costs are about $26,835,600/yr driven by staff wages, ongoing research/monitoring, utilities, and breach contingency replenishment.
One-Time Capital Costs
Total: $80.3M
Annual Recurring Costs
Total: $26.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$26.8M/yr
Uneventful year with routine operations, scheduled research, monitoring, maintenance, and normal personnel rotations.
normal operations
scheduled research campaigns
no major emergences or structural damage
🚨
Minor Incident
$28.8M/yr
Localized emergence or skirmish requiring TF deployment, limited structural/utility repairs, medical treatment and small-scale replacement of equipment.
small-scale emergence(s)
localized equipment damage
medical treatment and overtime
🚨
Major Breach
$41.8M/yr
Significant containment failure or large‑scale emergence requiring contractors, major structural repairs, heavy equipment replacement, legal/PR expenditures and accelerated research response.
large-scale emergence
structural collapse or deep subsurface activity
major legal/exposure event
Personnel
140 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 35 | [#7] Full-time perimeter/internal security personnel (24/7 coverage). |
| Armed Task Force / MTF Specialized Operators | 25 | [#8] Dedicated armed TF unit for engagements, higher wages and continual tactical training. |
| Research Scientist | 55 | [#13, #24, #29] Linguists, entomologists, cognitive scientists, materials engineers running long-term studies and grants. |
| Technician / Lab Technician | 10 | [#12, #16] Lab techs, IT, data ops, instrument maintenance and sample prep. |
| Medical Officer | 5 | [#14] On-site medical staff and quarantine response team. |
| Engineer / Maintenance | 6 | [#3, #5, #17] Civil/geotechnical, power and vehicle maintenance staff. |
| Administrative Staff | 4 | [#15, #27] Site administration, legal liaison, and cover-story coordination. |
Confidence Notes
Estimates are mid-range order-of-magnitude figures based on the analyst notes; many line items are well-defined (construction, personnel, equipment) but the object's unknown depth, sapience and episodic campaigns introduce substantial uncertainty.