SCP-6334
Unknown
~
medium confidence
SCP-6334
Expected annual
$1.7M
One-time setup
$1.6M
Annual recurring
$1.6M
Personnel
10
Estimated one-time setup and potential containment upgrades are roughly $1.62M, with ongoing annual operations around $1.63M driven primarily by staff wages, interdisciplinary research and monitoring, outreach/tipline operations, and a 20% black-budget overhead.
One-Time Capital Costs
Total: $1.6M
Annual Recurring Costs
Total: $1.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.6M/yr
Normal year with standard investigations, research, maintenance, outreach and contingencies; no major incidents or high-value procurement events.
standard field operations
ongoing research and monitoring
routine specimen turnover
🚨
Minor Incident
$1.8M/yr
Spike in recoveries leading to multiple autopsies, extra field deployments and additional lab testing.
multiple specimen recoveries
intensive autopsy/testing
extended field canvassing
🚨
High Value Demand
$2.1M/yr
Instances repeatedly demand high-value gemstones/elements, causing large procurement expenditures.
repeated high-value feed requests
procurement of rare gemstones
🚨
Containment Upgrade
$2.8M/yr
A single-year decision to construct/retrofit an anomalous-specific containment chamber (shock/EM shielding, anti-memetic measures).
discovery of a survivable/active instance
evidence of containment instability
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 5 | [#2, #12] Field search and secure transport teams; 4–6 FTE equivalents for canvassing and secure transfers. |
| Research Scientist | 3 | [#8, #9] Materials scientists, behavioral analysts, parapsychology/neurolinguistics specialists leading experiments and analysis. |
| Technician / Lab Assistant | 1 | [#8, #17] Technician support for lab equipment, sample prep, and autopsy assistance. |
| Administrative Staff / Call Center | 1 | [#3, #16] Tipline/operator, case database maintenance and logistics coordination. |
Confidence Notes
Estimates use midpoints of analyst ranges and explicit budget line-items; uncertainty remains due to per-specimen variability, conditional high-value feed demands, and low-probability containment engineering decisions.