SCP-6342
Unknown
~
medium confidence
SCP-6342
Expected annual
$33.8M
One-time setup
$14.5M
Annual recurring
$33.5M
Personnel
99
Initial capital costs are significant (~$14.5M) driven by vessel/sonar/ROV acquisition and a potential shore containment facility; annual operations are higher (~$33.46M/yr) driven primarily by patrol vessel operations, reserve heavy-vessel readiness, and staff wages.
One-Time Capital Costs
Total: $14.5M
Annual Recurring Costs
Total: $33.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$33.5M/yr
Routine monitoring and research year with no major incidents; operations as planned.
no_major_encounters
routine_patrols
regular_research
🚨
Minor Incident
$34.5M/yr
Localized encounter requiring an escalated capture attempt or additional sorties; limited damage and repair.
localized_encounter
single_capture_attempt
minor_equipment_damage
🚨
Major Breach
$43.0M/yr
Large-scale engagement or capture that triggers heavy mobilization, emergency response and significant one-time expenditures.
large_capture
shore_facility_activation
asset_loss_or_major_repair
Personnel
99 total
| Role | Count | Notes |
|---|---|---|
| Maritime Crew (skippers / engineers / deckhands / RHIB teams) | 60 | [#3] 24/7 vessel staffing for patrol vessels and RHIB teams (estimate based on 4 vessels + reserve rotations). |
| Research Scientists / Marine Biologists / Veterinarians | 15 | [#4, #14] MTF/containment specialists and long-term research staff for behavioral, pathology and environmental studies. |
| Security Officer / Armed Guards | 8 | [#18] Shore facility perimeter and site security staff (wages included in staff_wages). |
| Administrative Staff / Logistics | 6 | [#23, #30] Front-company administrative, procurement and logistics coordinators. |
| Data Analysts / Database Engineers | 4 | [#29] Intelligence and correlation research team for sighting analysis and pattern detection. |
| Medical Officer / Veterinarian Support | 2 | [#19] Medical support for field teams and potential specimen care. |
| Engineer / Maintenance | 4 | [#17, #6, #8] Technical staff for vessel/ROV/sonar/filtration maintenance and repairs. |
Confidence Notes
Analyst ranges are reasonably detailed and allow mid-range estimates, but SCP is uncontained/uncertain and many costs vary widely with operational tempo and whether permanent containment is pursued; this yields medium confidence.