SCP-6371
Archon
~
medium confidence
SCP-6371
Expected annual
$2.9M
One-time setup
$6.2M
Annual recurring
$2.8M
Personnel
13
Initial one-time setup is substantial (~$6.2M) driven by site acquisition, construction in an arctic environment, strategic reserve funding, and hardening; annual operations are ~ $2.77M driven by security payroll, remote logistics (helicopter/fuel), research/monitoring, and contingency.
One-Time Capital Costs
Total: $6.2M
Annual Recurring Costs
Total: $2.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.8M/yr
Normal, uneventful year with routine operations, maintenance, staffing and no major incidents.
steady_staffed_operations
routine_resupply_and_maintenance
🚨
Minor Incident
$3.2M/yr
Localized breach, unauthorized entry or weather damage requiring repairs, cleanup, extra deployments and short-term surge logistics.
localized_breach
unauthorized_entry
weather_damage
🚨
Catastrophic Breach
$5.8M/yr
Major structural failure, widespread exposure or public discovery requiring large-scale remediation, legal action, possible site hardening or evacuation.
widespread_exposure
structural_collapse
public_exposure
Personnel
13 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 10 | [#8] Steady armed security roster for 24/7 coverage and rotation in remote arctic deployment; mid-range roster size used. |
| Research Scientist | 2 | [#14] Senior anomalists/lead researchers (part-time/permanent oversight) to manage research/monitoring and analysis; salaries aggregated into staff wages. |
| Field Technician | 1 | [#14] Field tech for sensor maintenance, sample handling, and support of on-site operations; included in personnel wage total. |
Confidence Notes
Analyst notes provide line-item ranges and good coverage of arctic-specific costs, but large ranges for strategic reserves, incident frequency, staffing model (permanent vs remote) and Archon-level unknowns reduce precision; mid-range assumptions were used where ranges existed.