SCP-6383
Non-Anomalous
✓
high confidence
SCP-6383
Expected annual
$840K
One-time setup
$1.7M
Annual recurring
$825K
Personnel
6
First-year program (capital + one year of operations) requires significant upfront construction, specialized non-sentient systems and certifications; main cost drivers are chamber construction, robotics/handling equipment, initial research/tooling, and a contingency reserve. Ongoing annual costs are dominated by staffing, research operations, maintenance and insurance/oversight.
One-Time Capital Costs
Total: $1.7M
Annual Recurring Costs
Total: $825K/yr
Cost Scenarios
📊
Baseline
(baseline)
$825K/yr
Normal year with no containment incidents; routine operations, maintenance and audits only.
routine_operations
scheduled_maintenance
regular_research
🚨
Minor Incident
$900K/yr
Small equipment failure or HVAC/UPS outage requiring repairs, temporary downtime and extra contractor costs.
equipment_failure
hvac_outage
small_transport_incident
🚨
Major Breach
$2.0M/yr
Significant containment failure or transport accident requiring rebuild, replacement of major systems, legal/PR response and extended investigations.
procedural_failure
major_transport_accident
unexpected_exposure
Personnel
6 total
| Role | Count | Notes |
|---|---|---|
| Containment Lead | 1 | [#10] Senior responsible officer; salary included in staff_wages. |
| Robotics/Systems Technician | 1 | [#10] Maintenance and systems specialist; salary included in staff_wages. |
| Remote Operator / Monitor | 2 | [#10] Operators for remote-handling and monitoring; salaries included in staff_wages. |
| Security Officer / MTF Agent | 2 | [#10] Perimeter security guards/minimal on-site presence; salaries included in staff_wages. |
Confidence Notes
Analyst provided detailed line-item estimates for construction, equipment, staffing and recurring ops; numbers are standard facility and program costs with moderate predictability. Remaining uncertainty is in incident frequency and contingency sizing.