SCP-6427
Keter2
~
medium confidence
SCP-6427
Expected annual
$11.9M
One-time setup
$22.8M
Annual recurring
$11.8M
Personnel
26
Estimated one-time capital of approximately $22.8M to build hardened containment, specialized hardware, and reserves, with recurring annual costs ≈ $11.79M driven by specialized staff, insurance/reserves, continuous-description consumables, and research/monitoring.
One-Time Capital Costs
Total: $22.8M
Annual Recurring Costs
Total: $11.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$11.8M/yr
Normal, uneventful year with routine operations, maintenance, and research; no containment breach or major incident.
no_breach
normal_staffing
routine_maintenance
🚨
Minor Incident
$12.3M/yr
Localized containment breach or equipment failure requiring overtime response, limited repairs, amnestic use, and PR mitigation.
localized_breach
equipment_failure
limited_exposure
🚨
Major Breach
$14.8M/yr
Significant breach requiring multi-site response, emergency relocations, large amnestic mobilization, repair/rebuild, and major legal/insurance outlays.
major_containment_failure
mass_amnestics
extensive_repairs
🚨
Catastrophic Breach
$19.8M/yr
Widespread uncontrolled breach or public exposure requiring partial site shutdown, invocation of decommissioning protocols, large settlements, and multi-year recovery.
site_wide_breach
public_exposure
decommissioning_actions
Personnel
26 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist (memeticists / xenopsychologists / containment engineers) | 8 | [#7] Senior memeticists, xenopsychologists and containment engineers included in specialized research team salaries. |
| Field Xenobiologist | 2 | [#7] Two full-time field xenobiologists as noted in research staffing. |
| Security Officer / MTF Agent | 16 | [#8] Dedicated security staff (12–20 personnel) averaged to 16 for 24/7 coverage and rapid response. |
Confidence Notes
Analyst notes are detailed and enumerate most cost drivers, but wide ranges (particularly for reserves, insurance, and unknown antimemetic behaviors) create material uncertainty in point estimates.