SCP-6446
Unknown
~
medium confidence
SCP-6446
Expected annual
$1.7M
One-time setup
$1.8M
Annual recurring
$1.7M
Personnel
14
Initial setup requires substantial facility upgrades, biosafety infrastructure and robotics (~$1.81M one-time including reserves). Primary recurring drivers are personnel (security and scientific staff) and ongoing research/monitoring (~$1.66M/yr).
One-Time Capital Costs
Total: $1.8M
Annual Recurring Costs
Total: $1.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.7M/yr
Normal operational year with no major incidents; routine research, monitoring and maintenance only.
routine_operations
scheduled_research
no containment breach
🚨
Minor Incident
$1.9M/yr
Limited containment incident (injury, contaminated sample, one-off anomalous emergence) requiring medical response, overtime, targeted decontamination and extra testing.
limited_emergence
medical_treatment
targeted_decontamination
🚨
Major Breach
$3.2M/yr
Significant breach with multiple affected personnel, large-scale decontamination, extended quarantine, specialist contractor involvement and possible temporary site shutdown.
multi-person_emergence
widespread_contamination
extended_site_response
🚨
Political Exposure
$3.7M/yr
Public exposure or regulatory/political incident requiring legal action, major PR/cover operations, relocation or large settlements.
public_disclosure
regulatory_inquiry
media_exposure
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#10] Six on-site guards to provide 24/7 coverage (two per shift). |
| Security Supervisor | 1 | [#10] Single supervisor for security staff and scheduling. |
| Research Scientist | 2 | [#11] Senior researchers assigned to containment and experimental design. |
| Lab Technician | 2 | [#11] Laboratory technicians for sample processing and assays. |
| Systems Engineer | 1 | [#11] Systems/robotics engineer to maintain manipulators, remote platforms and integration. |
| Medical Officer / Nursing Support | 2 | [#12] Part-time physician and nursing support allocated for decontamination and monitoring. |
Confidence Notes
Analyst notes supply line-item estimates but several items depend on Site-105 providing baseline infrastructure (BSL-3 availability, building shell) and on unpredictable anomalous behavior; decommissioning range and contingency needs add uncertainty.