SCP-6487
Unknown
~
medium confidence
SCP-6487
Expected annual
$714K
One-time setup
$710K
Annual recurring
$693K
Personnel
4.7
Estimated one-time setup costs are approximately $710,000 driven by aviary build-out, vehicle and contingency reserves; annual recurring costs are approximately $693,000/yr dominated by personnel, ongoing research, and replacement reserves.
One-Time Capital Costs
Total: $710K
Annual Recurring Costs
Total: $693K/yr
Cost Scenarios
📊
Baseline
(baseline)
$693K/yr
Normal year with no major incidents; routine care, research, and scheduled maintenance only.
routine care
scheduled maintenance
standard research activities
🚨
Minor Incident
$743K/yr
One or a few animals require emergency surgery/recovery or equipment failure requiring rapid replacement but no large-scale outbreak.
wing tear requiring surgery
single-equipment failure (lift, PnB) requiring emergency replacement
localized infection
🚨
Major Outbreak
$993K/yr
Disease outbreak or mass-mortality event requiring large-scale quarantine, rebuild, disposal and emergency response.
disease outbreak
mass mortality
quarantine rebuild
🚨
Political Exposure
$843K/yr
Public exposure or legal complication requiring large legal/PR/amnestic operations and settlements.
public exposure
legal settlement
large-scale amnestic deployment
Personnel
4.7 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Parazoological Researcher | 1.0 | [#7] Full-time parazoological researcher (1.0 FTE). |
| Medical Officer / Large-Animal Veterinarian | 1.0 | [#7] Full-time large-animal veterinarian (1.0 FTE). |
| Animal Care Technician | 2.0 | [#7] Two full-time animal care/technicians responsible for daily handling and feeding (2.0 FTE). |
| Security Officer / MTF Agent (incremental) | 0.5 | [#7] 0.5 FTE incremental security allocation for constant supervision needs. |
| Engineer / Biomechanical Specialist (consultant) | 0.2 | [#7] 0.2 FTE biomechanical specialist/consultant for monthly PnB checks and prosthetic work. |
Confidence Notes
Estimates are based on detailed analyst line-items and explicit salary and consumable figures, but several contingency elements (outbreak scale, anomalous-specific needs, regional utility variation) are uncertain and could materially change costs.