SCP-6522
Safe
~
medium confidence
SCP-6522
Expected annual
$1.8M
One-time setup
$10.9M
Annual recurring
$1.8M
Personnel
18
First-year one-time setup costs (land, fencing, sensors, research array and contingency) are roughly $10.9M, driven primarily by land acquisition and active-containment/research hardware; ongoing annual operations are roughly $1.79M largely for staff, research, and a thaumaturgical retainer.
One-Time Capital Costs
Total: $10.9M
Annual Recurring Costs
Total: $1.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.8M/yr
Normal operational year with purchase-based land control, routine maintenance, and regular research operations; no major incidents.
no major incidents
scheduled maintenance
routine research activity
🚨
Minor Incident
$1.9M/yr
Localized vandalism, storm damage, or small-scale equipment failure requiring repairs and extra dispatches.
severe weather
vandalism
single-site equipment failure
🚨
Major Breach
$3.3M/yr
Significant containment breach or discovery by civilians requiring major remediation, legal action, and deployment of contingency assets.
large-scale unauthorized access
root-network active manipulation
major equipment destruction
🚨
Thaumaturgical Interaction
$2.3M/yr
Anomalous/ethereal I/O is detected that necessitates extensive thaumaturgical response and specialist operations beyond baseline retainer.
evidence of ethereal gateways
unusual correlated activity tied to UXP
GOI involvement requiring ritual response
Personnel
18 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#8] Rotational security response team and on-call readiness; headcount aligned with recurring security staffing costs. |
| Video Monitoring Operator | 4 | [#7] 24/7 camera/analytics monitoring and supervision; staffing level supports continuous coverage. |
| Research Scientist | 6 | [#18] Botanists, electricians, and data scientists performing ongoing characterization and experiments. |
| Crypto/IT Specialist | 2 | [#21] Forensic IT, secure asset management, and cold-wallet/key custody operations. |
Confidence Notes
Line-item estimates are based on typical civilian/contractor pricing and the analyst notes; major uncertainties remain around land price variability, scope choice (purchase vs lease), the optional active-containment hardware, and any thaumaturgical/GOI-driven costs, so confidence is medium.