SCP-6559
Unknown
?
low confidence
SCP-6559
Expected annual
$53.5M
One-time setup
$69.5M
Annual recurring
$48.3M
Personnel
60
[#36] Baseline one-time setup is significant (~$69.6M) driven by vessel/equipment purchases, forward-site upgrades, and contingency reserves; annual operating costs are large (~$47.0M/yr) driven primarily by vessel charters, ROV/AUV operations, staff wages, and contingency/standby resources.
One-Time Capital Costs
Total: $69.5M
Annual Recurring Costs
Total: $48.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$48.3M/yr
Normal operational year with no major incidents; regular voyages, maintenance, research, and monitoring continue per-plan.
planned_missions
routine_maintenance
🚨
Minor Incident
$54.0M/yr
Localized incident such as a salvage requiring extra missions, small spill, minor public leak requiring PR/legal action.
small_salvage
localized_spill
minor_public_exposure
🚨
Major Breach
$107.0M/yr
Loss of a major vessel or large-scale damage to assets, requiring emergency salvage, replacement charters, and significant legal/compensation payouts.
vessel_loss
major_structure_activity
crew_casualties
🚨
Catastrophic Breach
$247.0M/yr
Catastrophic escalation or international incident requiring large-scale engineering countermeasures, major remediation, and extensive diplomacy/legal settlements.
international_exposure
large_scale_containment_work
major_environmental_damage
🚨
Research Breakthrough Requiring Scale Up
$97.0M/yr
Significant scientific discovery or change in anomaly behavior forcing program scale-up (new site construction, dedicated icebreaker, expanded staff and engineering).
major_discovery
requirement_for_dedicated_icebreaker
scale_up_of_containment
Personnel
60 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist (senior) | 10 | [#11] Senior researchers and principal investigators; compensation included in staff_wages. |
| Research Scientist / Engineer (mid-level) | 20 | [#11] Mid-level scientists, geophysicists, and engineers; compensation included in staff_wages. |
| Technician / ROV Pilot | 20 | [#11] Lab technicians, ROV/AUV pilots, and field technicians; compensation included in staff_wages. |
| Security Officer / MTF Agent | 6 | [#11, #13] Site and transport security personnel; costs included across staff_wages and security line items. |
| Engineer / Maintenance | 2 | [#11, #27] Facilities and maintenance engineers supporting vessels, winches, and lab systems. |
| Administrative Staff | 2 | [#11] Project admin, logistics, and finance support; compensation included in staff_wages. |
Confidence Notes
Many high-uncertainty and contingent line items (subsea engineering, vessel losses, legal escalation) with wide ranges in the analyst notes and limited characterization of anomaly behavior, so cost estimates rely on mid-range assumptions and are low-confidence.