SCP-6570
Unknown
~
medium confidence
SCP-6570
Expected annual
$2.4M
One-time setup
$1.1M
Annual recurring
$2.4M
Personnel
14.2
Estimated one-time setup costs are approximately $1.15M driven by buildout, specialized equipment, and an emergency reserve; recurring annual operating costs are approximately $2.36M/yr driven primarily by specialized staff wages and sustained research programs.
One-Time Capital Costs
Total: $1.1M
Annual Recurring Costs
Total: $2.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.4M/yr
Normal year with no major incidents; regular operations, research, and maintenance only.
stable containment
routine research activity
🚨
Minor Incident
$2.6M/yr
Localized containment incident requiring emergency response, temporary quarantine expansion, and legal/PR activity.
localized breach / contamination
contractor remediation
limited media exposure
🚨
Major Breach
$4.9M/yr
Significant containment failure requiring major neutralization, facility repairs, staff replacement, and extensive legal/PR actions.
major containment breach
need for neutralization/large-scale decontamination
public exposure / litigation
Personnel
14.2 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#8] Six guards to cover 24/7 (duo rule). |
| Security Supervisor | 1 | [#8] One supervisor overseeing security shifts. |
| Research Scientist (Senior/Lead) | 1 | [#9] Senior containment scientist / PI responsible for research oversight. |
| Medical Officer / Veterinarian | 1 | [#9] Vet/medical officer for health monitoring and interventions. |
| Biohazard Technician | 2 | [#9] Two technicians for routine care, sampling, and maintenance. |
| Psychologist (part-time FTE) | 0.2 | [#9] Part-time psychologist (0.2 FTE) to advise on social interactions and provide staff support. |
| Operations Coordinator / Administrator | 1 | [#9] Coordinator for scheduling, logistics, and liaison duties. |
| CCTV Monitoring / Incident Response Staff | 2 | [#18] 1–2 FTE monitoring staff to watch 24/7 feeds and trigger response protocols (modeled as 2 FTE). |
Confidence Notes
Notes provide detailed line-item estimates for most categories, so core cost ranges are reasonably well-constrained; however uncertainty remains around research scope, potential transmissibility or need for BSL‑4 upgrades, and the frequency/severity of containment incidents, so total costs could vary substantially.