SCP-6575
Keter
~
medium confidence
SCP-6575
Expected annual
$27.6M
One-time setup
$26.8M
Annual recurring
$27.3M
Personnel
44
One-time capital costs are estimated at roughly $26.8M, driven by a hardened Secure Surrealistics wing, transport asset acquisition, and an amnestic stockpile. Ongoing annual operating costs are large (~$27.3M/yr) driven by specialized staff wages, contingency/resilience reserves, classified contingency funds, logistics, and capital maintenance.
One-Time Capital Costs
Total: $26.8M
Annual Recurring Costs
Total: $27.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$27.3M/yr
Normal operational year with no major incidents; recurring budgets cover routine response, maintenance, R&D and contingency reserves.
no major SCP-6575 events
routine drills and maintenance only
🚨
Minor Incident
$27.5M/yr
One or more small-scale SCP-6575 events occur requiring rapid-deployment, amnestic administration, temporary detainment and localized cleanup.
small localized SCP-6575 event
single-site rapid deployment and limited amnestic use
🚨
Major Breach
$32.3M/yr
Large/high-profile SCP-6575 event causing significant response, mass amnesticization, large-scale detainment and major legal/cover-up expenditures.
large multi-site SCP-6575 event
mass civilian exposure and high-profile media attention
Personnel
44 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist (Surrealistics Department) | 10 | Design Procedure 6575/BACKDRAFT, predictive modeling and classified information custodians; aligns with #3 estimates. |
| Security Officer / MTF Agent (Nu-1) | 27 | Operational field team with rotational coverage and low-CRV requirement; aligns with #4 staffing estimates. |
| Medical Officer | 4 | Amnestic administration, medical monitoring and emergency treatment; aligns with #11 recurring medical staff costs. |
| Compliance / Audit Officer | 3 | Protocol enforcement and audits to ensure Procedure 6575/BACKDRAFT compliance; aligns with #20. |
Confidence Notes
Analyst notes provide detailed scoped line items and ranges, allowing a reasoned mid-range estimate; however wide ranges on capital purchases, event severity/frequency and classified/black-ops spend produce substantial uncertainty.