SCP-6578
Safe
~
medium confidence
SCP-6578
Expected annual
$807K
One-time setup
$1.1M
Annual recurring
$797K
Personnel
8
One-time startup capital is dominated by land control, quarantine buildout and contingency reserves (~$1.05M); annual operating costs are driven by research staffing, security, monitoring and per-event transport/research costs (~$796.9k/yr).
One-Time Capital Costs
Total: $1.1M
Annual Recurring Costs
Total: $797K/yr
Cost Scenarios
📊
Baseline
(baseline)
$797K/yr
Normal, uneventful year with routine monitoring, occasional transfers (3 events/yr assumed), and ongoing research operations.
routine_monitoring
scheduled_research_transfers
no_unauthorized_burials_or_public_exposure
🚨
Minor Incident
$847K/yr
Localized unauthorized burial or discovery requiring forensic excavation, modest legal/outreach, and limited emergency response.
unauthorized_burial_discovered
forensic_excavation
local_investigation
🚨
Major Breach
$1.4M/yr
Significant public exposure or multiple simultaneous incidents triggering contingency reserves, large emergency operations and legal settlements.
public_exposure
mass_media_investigation
multiple_unauthorized_burials_or_broad_breach
Personnel
8 total
| Role | Count | Notes |
|---|---|---|
| Site Director / Executive Staff | 1 | [#25, #13] Project director / oversight (salary/administration included in research/staff budgets). |
| Research Scientist / PI | 1 | [#13] PI overseeing studies (part of research salaries accounted in staff_wages). |
| Research Technician | 2 | [#13] Two research technicians for assays and sample handling (salaries included in staff_wages). |
| Medic / Nurse | 1 | [#13] Medic/nurse for transfers and intake (salary included in research/staff costs). |
| Security Officer / MTF Agent (Site Caretaker) | 1 | [#5] Full-time site caretaker/security presence (~$60k/yr). |
| Engineer / Maintenance | 1 | [#6, #23] Grounds and equipment maintenance (vegetation, fences, periodic repairs). |
| Administrative Staff | 1 | [#24] Administrative/project management and procurement (overhead budgeted separately). |
Confidence Notes
Analyst notes provide detailed line-item estimates for most costs; however several assumptions were chosen by the analyst (events/year = 3, splits between salary vs. operations, use of the consolidation line) and some items (long-term custody frequency, incident probabilities) are uncertain, so confidence is medium.