SCP-658
Euclid
~
medium confidence
SCP-658
Expected annual
$3.0M
One-time setup
$3.8M
Annual recurring
$2.9M
Personnel
29
One-time startup costs of approximately $3.76M driven by facility retrofits, redundant-site standup, and contingency seed; recurring annual costs ~ $2.92M/yr driven primarily by 24/7 personnel, research program spending, and remediation/disposal logistics.
One-Time Capital Costs
Total: $3.8M
Annual Recurring Costs
Total: $2.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.9M/yr
Normal year with routine research, containment operations, and no major incidents.
routine_research
no_breach
limited_disposals
🚨
Minor Incident
$3.1M/yr
Localized breach or several small host destructions requiring extra deployments, disposals, and limited public compensation.
single_site_breach
multiple_small_host_events
🚨
Major Breach
$3.9M/yr
Significant contamination of facility systems or public infrastructure requiring large-scale remediation, heavy demolition, and extensive PR/legal action.
server_room_infestation
industrial_control_systems_compromised
🚨
Catastrophic Breach
$7.9M/yr
Uncontrolled mass infestation of public devices or large-meter-scale instance requiring explosives/airlift, mass amnestics, and multi-site remediation.
mass_public_infestation
large_instance_emergence
Personnel
29 total
| Role | Count | Notes |
|---|---|---|
| Containment Technician | 6 | Three-shift coverage for mechanical-only handling and specimen maintenance (note #5). |
| Security Officer / MTF Agent | 6 | On-site 24/7 guard coverage; additional MTF teams available for deployments (note #5, #6). |
| Supervisory Staff / Research Liaison | 2 | Supervisors and liaisons coordinating research and containment (note #5). |
| Research Scientist | 4 | Staff to run controlled reproduction experiments and analysis (note #14). |
| Laboratory Technician | 6 | Techs for experiment setup, host preparation, and consumables handling (notes #7, #9, #14). |
| Engineer / Maintenance | 2 | Maintain non-electronic retrofits, transport vehicle upkeep, and mechanical containment hardware (notes #3, #12, #19). |
| Medical Officer | 1 | Occupational health surveillance and injury response (note #8). |
| Administrative Staff | 2 | Paper-logistics management, legal/PR coordination, procurement support (notes #16, #18). |
Confidence Notes
Mid-level confidence: containment and recurring staffing costs are well-specified, but many line items (per-incident demolition, public-exposure expenses, and research scale) have very wide ranges and depend heavily on incident frequency and program policy.