SCP-660
Safe
~
medium confidence
SCP-660
Expected annual
$1.1M
One-time setup
$2.4M
Annual recurring
$1.0M
Personnel
6
One-time startup costs are dominated by a potential BSL-3 lab upgrade and specialized neutralization/insurance reserves (~$2.4M total one-time). Recurring annual costs are driven by staff wages, an optional long-term experimental program, contingency/reserve funding and site overhead (~$1.04M/year).
One-Time Capital Costs
Total: $2.4M
Annual Recurring Costs
Total: $1.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.0M/yr
Normal uneventful year with routine operations, scheduled research activity and no major incidents.
routine_storage_and_research
no_incidents
🚨
Minor Incident
$1.1M/yr
Localized containment/tamper event or small contamination requiring response, limited remediation and short-term increased testing.
localized_contamination
minor_tampering
small-scale_remediation
🚨
Major Breach
$1.5M/yr
Significant containment breach, transformation event or public exposure requiring large-scale remediation, neutralization and legal management.
containment_breach
massive_transformation
public_exposure
🚨
Research Breakthrough Requiring Scale Up
$1.3M/yr
Unexpected promising research result that triggers rapid scale-up of experimental program and facility capability.
positive_research_results
scale_up_required
Personnel
6 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 2 | [#5] Two dedicated guards (pro-rated salaries/benefits included in staff_wages) to cover secure-site hours and escort duties. |
| Research Scientist / PI | 1 | [#11] Principal Investigator (pro-rated FTE contributing to SCP-660 research) included in research salaries. |
| Research Scientist / Postdoc | 1 | [#11] Postdoctoral researcher or equivalent (pro-rated FTE) included in research salaries. |
| Lab Technician | 1 | [#11] Laboratory technician for sample handling, assays and routine maintenance included in research salaries. |
| Administrative Staff | 1 | [#5, #11] Administrative / compliance support (scheduling, documentation, procurement) to support containment and research; included in staff_wages. |
Confidence Notes
Costs are based on analyst-provided ranges and standard institutional budgeting; main uncertainties are choice between external BSL-3 access vs internal upgrade, frequency of check-outs/transports, whether the long-term experimental program is pursued, and incident probabilities/severity.