SCP-665
Safe
~
medium confidence
SCP-665
Expected annual
$1.2M
One-time setup
$1.8M
Annual recurring
$1.2M
Personnel
10
One-time capital of approximately $1.76M for specialized stainless containment, heavy-handling equipment, and surgical/lab setup; annual operations ~ $1.22M driven mainly by staffing, research, and maintenance.
One-Time Capital Costs
Total: $1.8M
Annual Recurring Costs
Total: $1.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.2M/yr
Normal year with routine operations, no major incidents or evacuations.
routine_operations
scheduled_research
no_evacuations
🚨
Minor Incident
$1.3M/yr
Small containment-impacting event (sensor loss, minor mass assimilation requiring modest retrofit or extra consumables).
sensor_loss
small_mass_increase
short-term_research_effort
🚨
Major Breach
$1.6M/yr
Evacuation or large-mass assimilation event requiring heavy transport rental/purchase, structural retrofits, and significant replacement of equipment.
full_site_evacuation
large_mass_increase
major_equipment_loss
🚨
Political Exposure
$1.7M/yr
Accidental civilian exposure or legal/PR crisis requiring major cover-story overhaul, legal settlements, and public relations response.
accidental_public_exposure
local_authority_involvement
media_attention
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#14] 24/7 coverage (2 guards per shift, 3 shifts) as described; salaries+benefits included in staff_wages. |
| Containment Specialist | 2 | [#15] Senior containment specialists assigned to SCP-665; staffing & salary portion included in staff_wages. |
| Medical Officer | 1 | [#15] On-call attending medical staff (fractional pay accounted in staff_wages). |
| Pathologist / Researcher (part-time) | 1 | [#15] Part-time pathologist/researcher (≈0.5 FTE) included in staff_wages; counted as one head for rostering. |
Confidence Notes
Analyst notes provide detailed line items and ranges, enabling order-of-magnitude estimates, but many items have wide ranges (capital laser, evacuation equipment) and the object's dynamic mass growth introduces structural and cost uncertainty, reducing confidence.