SCP-6651 Unknown ? low confidence
SCP-6651
Expected annual
$6.3M
One-time setup
$38.3M
Annual recurring
$6.0M
Personnel
26
One-time setup and acquisition dominate costs (site purchase, inner containment, R&D seed, contingency, and possible large relocation). Annual costs driven by security and multidisciplinary research staffing, ongoing R&D, legal/cover operations, and facility maintenance.
🏗️ One-Time Capital Costs Total: $38.3M
Relocation Large Scale $16.5M
[#25] One-time estimated budget for large-scale relocation to a hardened underground facility or similar (planning and execution dependent on destination and international cover).
Contingency Reserve $8.5M
[#16] Large one-time reserve fund for unexpected anomalous reality shifts, large-scale remediation, or emergency replacement of destroyed infrastructure.
Initial Research And Lab Setup $4.5M
[#9] Anti-memetic / noospheric R&D seed funding and initial lab buildout for specialized non-symbolic sensors, memetic dampeners and development infrastructure.
Site Acquisition Purchase $2.5M
[#1] One-time purchase or expropriation compensation to secure Ogrodzieniec Castle and buffer land; includes cadastral transfer, title insurance, and Polish legal counsel.
Facilities $1.9M
[#3, #5] Physical construction: reinforced perimeter fencing/gates and a hardened inner containment vault (concrete chamber, airlocks, hermetic seals, HVAC integration).
Equipment $1.7M
[#6, #7, #10, #11, #12, #22, #23] Specialized hardware and devices: preservation hardware (cryostorage/inert-gas slabs), initial heavy-lift/crane rentals and structural reinforcement, redundant sensor suites and instrumentation, PPE/decon equipment, backup generator/UPS hardware, baseline environmental sampling kit, and initial vehicle purchase.
Long Term Care Reserve $1.1M
[#24] One-time reserve for long-term disability care / retirement / compensation for staff affected by anomalous cognitive injury.
Community Compensation Initial $600K
[#15] One-time community settlement packages/grants to mitigate tourism loss and local resistance.
Emergency Assets Initial $500K
[#17] Initial purchase of rapid-deployment assets and vehicles (mobile medical units, evacuation vehicles, radio/comm gear, helicopter charters deposit).
Legal And Permit Initial $175K
[#13] Initial legal fees, permitting, and negotiation costs for land acquisition/expropriation and initial liaison with Polish authorities.
Site Takeover Operations $162K
[#2] Immediate takeover costs: temporary fencing, signage, mobile checkpoints, road closures, police liaison fees, and PR/cover materials for 'restoration' closure.
Public Cover Initial $150K
[#14] Initial setup costs for public-facing cover (website, press materials, staged restoration funds, initial reimbursements to local businesses).
Training Program Setup $48K
[#20] One-time setup cost for memetic hygiene and specialized training program creation.
🔄 Annual Recurring Costs Total: $6.0M/yr
Staff Wages $2.2M/yr
[#4, #8, #19, #11] Ongoing personnel compensation: armed security rotations, multidisciplinary research staff (parapsychologists/memeticists/linguists/folklorists), document-control/intel staff, and on-site medical personnel.
Research And Monitoring $1.3M/yr
[#9, #21] Ongoing anti-memetic R&D program operating budget and external cultural/folklore consultancy/translation services.
Cover Story And Legal $650K/yr
[#13, #14, #15] Ongoing legal fees, permit management, public cover operations (continuing PR, website, reimbursements) and community subsidies.
Supplies And Consumables $412K/yr
[#6, #10, #11, #22] Consumables and calibration: LN2 and inert-gas supplies, instrument calibration/replacement, PPE consumables, and routine environmental sampling costs.
Facilities Maintenance $352K/yr
[#3, #5, #18] Annual maintenance of perimeter and vault systems, HVAC servicing, routine structural inspections, vegetation control and site infrastructure upkeep.
Emergency Response Readiness $325K/yr
[#17] Annual readiness costs for on-call ERT, hazmat standby, aerial charter retainers and mobile medical readiness.
Site Acquisition Lease $250K/yr
[#1] Recurring lease/compensation option alternative to outright purchase (annual compensation/hush payments and lease fees).
Psychological Support And Care $150K/yr
[#24] Ongoing counseling, debriefing, screening, and disability-related recurring costs for staff potentially affected by incomprehension or cognitive injury.
Logistics And Transport $120K/yr
[#23, #7] Fleet leases/vehicle fuel and maintenance for staff rotations, secure equipment transport logistics; baseline allocation for routine transport.
Training And Memetic Hygiene $75K/yr
[#20] Recurring memetic-hygiene refresher training, screening, and program delivery costs.
Future Relocation Cost Reserve $50K/yr
[#7] Annual set-aside to cover logistics for any future moves (permits, escort convoys, crane rentals) averaged over time.
Backup Power Fuel $48K/yr
[#12] Fuel, routine generator maintenance, and UPS service contracts required to keep backup power and environmental controls operational.
Cost Scenarios
📊 Baseline (baseline) $6.0M/yr
87.5% probability / year
Normal operational year with no major incidents; routine maintenance, staffing, and ongoing R&D.
no breach routine operations ongoing research
🚨 Minor Incident $6.2M/yr
10.0% probability / year +$200K vs baseline
Localized contamination, brief partial breach, or short-term reality-shift requiring emergency response and repairs.
minor containment breach localized infrastructure damage short emergency mobilization
🚨 Major Breach $11.0M/yr
2.0% probability / year +$5.0M vs baseline
Significant containment breach or prolonged noospheric effect requiring relocation of assets, major repairs, extended R&D, and large community/legal expenditures.
major containment failure extended reality-shift requiring remediation forced temporary relocation
🚨 Catastrophic Breach $31.0M/yr
0.5% probability / year +$25.0M vs baseline
Site loss or catastrophic reality alteration forcing complete relocation to a hardened facility and full program rebuild.
total site compromise irreversible reality shift full large-scale relocation
👥 Personnel 26 total
Role Count Notes
Security Officer / MTF Agent 12 [#4] On-site armed security rotational coverage (visible and covert), rapid-response capability. Count chosen from analyst's 10–20 guidance; wages included in staff_wages.
Research Scientist 8 [#8, #9, #21] Multi-disciplinary research staff (parapsychologists, memeticists, folklorists, linguists) for study of noospheric effects and R&D; salaries included in staff_wages and R&D budgets.
Document Control / Intelligence Management 2 [#19, #13] Staff for censorship, FOIA/press handling, and sensitive record management; wages budgeted in staff_wages.
Medical Officer 1 [#11, #24] On-site medic trained for anomalous cognitive events and decontamination; wages and recurring medical costs budgeted.
Engineer / Maintenance 2 [#12, #18] Facility maintenance and systems engineers for HVAC, generators, and structural upkeep; wages included in staff_wages and facilities_maintenance covers consumables.
Administrative Staff 1 [#13, #14, #15] Site administration, legal liaison coordination and cover-operations administrative support; wages included in staff_wages and cover_story_and_legal.
📋 Confidence Notes
While many line-item ranges are provided, the SCP's antimemetic/erloschen properties and potential for reality-shifting events introduce large, unpredictable variance in both one-time and recurring costs; contingency and R&D estimates drive major uncertainty.
← SCP-6650 ↑ All SCPs SCP-6652 →