SCP-6686
Unknown
?
low confidence
SCP-6686
Expected annual
$167.1M
One-time setup
$2.6B
Annual recurring
$146.3M
Personnel
25
Estimated one-time program setup is approximately $2.57 billion driven primarily by construction/space-rated containment, station modifications, on-orbit installation and contingency reserves; ongoing annual operations are roughly $146 million/year driven by Mercury operations, resupply/propellant, orbital monitoring and staffing.
One-Time Capital Costs
Total: $2.6B
Annual Recurring Costs
Total: $146.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$146.3M/yr
Normal operational year with no major incidents; routine staffing, monitoring, Mercury staging and scheduled maintenance.
routine_operations
scheduled_maintenance
no_incidents
🚨
Minor Incident
$156.3M/yr
Localized equipment failure or small containment subsystem fault requiring emergency repairs, temporary ejection test or limited retrieval mission.
equipment_failure
minor_breach
unscheduled_ejection_test
🚨
Major Breach
$396.4M/yr
Significant containment failure or intentional ejection with large-scale response: full retrieval mission, major interceptor ops and substantial PR/liaison costs.
containment_breach
large_retrieval_required
international_exposure
🚨
Catastrophic Breach
$1.1B/yr
Severe catastrophic event requiring major multi-year response, large-scale orbital operations, potential module loss and extensive international crisis management.
station-wide_failure
module_loss
major_public_exposure
Personnel
25 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 10 | Senior and mid-level scientists focused on QCD theory and anomaly analysis (covered by staff_wages #8). |
| Optical Engineer | 4 | Design and operate FSO/optical isolation systems and imaging hardware (covered by staff_wages #8). |
| Xenoscience Researcher | 3 | Specialists in exotic-matter and xenobiology-like analysis (covered by staff_wages #8). |
| Operators/Technicians | 4 | Lab technicians, instrument operators and station integrators (covered by staff_wages #8). |
| Administrative Staff | 2 | Logistics, admin and liaison support for the research team (covered by staff_wages #8). |
| Medical Officer | 1 | On-station medic/psychological support (recurring medical budget #22). |
| Engineer / Maintenance | 1 | Dedicated engineer for containment systems maintenance (covered by staff_wages #8 and facilities maintenance). |
Confidence Notes
Estimates are low-confidence due to large ranges in analyst notes, heavy dependence on existing infrastructure (Laniakea/Mercury facilities), uncertain incident frequencies, and poorly-constrained engineering requirements for space-rated QCD-matter containment.